Forum quick links
Fire Alarm System components and other facility services subgroups systems
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Aaron McEwin on
Previous versions of LEED stipulated the Material and Resource Credits only applied to Divisions 2-10 products.
Fire Alarm System components and other facility services subgroups systems
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Aaron McEwin on
Previous versions of LEED stipulated the Material and Resource Credits only applied to Divisions 2-10 products.
Advanced Energy Metering, Opt.2 - Data Must Be Remotely Accessible
CI-v4 EAc3:Advanced energy meteringposted by Graeme Smith on
We under that... "The data must be remotely accessible"... but how does USGBC define remote accessibility?
Weather files with predicted future data?
posted by Mark Meaders on
Does anyone know where one can locate weather files (EPW) that has predicted future data for climate change?
Thanks in advance.
Pilot Credits: Safety First - Cleaning and Disinfecting; Re-enter Your Workplace
NC-v4 INc1:Innovationposted by Bethany Beers on
We interpreted the intent of these two COVID-related pilot credits to be: provide a safe working environment during construction.
Base building versus tenant metering
CS-v4 EAp3:Building-level energy meteringposted by Jens Apel on
Maybe I am overly cautious, but I would like to clarify the following.
Carpool Hours
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Sadie Martin on
Hi, has anyone has success with noting the carpool stalls are only used during certain hours of the day (like during typical office hours)?
Default contract length for renewable energy procurement
NC-v4.1 EAc5:Renewable Energyposted by Bryna Dunn on
Under the definitions of Tier 1, Tier 2, and Tier 3, there is a statement that reads: "The default contract length for renewable energy procurement is 10 years.