Does the paring now have to be on-site?
CS-v4.1 LTc8:Electric Vehiclesposted by Maria Porter on
I have had many projects in v2009 that have had their parking in a neighboring garage if they don’t have their own garage. I have ongoing projects in v4 with the same situation.
Do toilet rooms count as non-regularly occupied spaces?
Pilot-Credits EQpc116:Daylight in nonregularly occupied spacesposted by Kristian Kicinski on
We are considering this credit for a large high school. We have some large toilet room areas and are wondering if these fall into the "non-regularly occupied" or "unoccupied category".
Written Commitment from the Owner
Pilot-Credits EQpc44:Ergonomics approach for computer usersposted by Laura Heagler on
Our project is registered under LEED v4 BD+C.
Flushing Out a Hockey Rink
NC-v4 EQc4:Indoor air quality assessmentposted by Cynthia Kaplan on
My project is a new construction hockey arena pursuing Option 1, Path 1 for the flush out. The thing is, we have ice. Ambient temperatures will not be above 60 degrees.
Can we pursue both Path 1 and Path 2
NC-v4.1 LTc5:Access to Quality Transitposted by Jyothsna Giridhar on
Am I correct in my interpretation that we cannot include campus shuttles as well as public transit? Does it have to be either one or both can be counted?
V4 Entrance mats/roll-up mats
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Kathryn Haeberle on
Hi, does anyone know if the v2009 interpretation still applies that the first 3 ft of the 10 ft must be a permanent system (like recessed mat system) and the remainder can be roll-up mats
ASHRAE 90.1 - 2016 Mandatory Requirements, Submetering
NC-v4.1 EAp2:Minimum Energy Performanceposted by Parker Hall on
Can you please check my logic and confirm if submetering is required on all LEED v4.1 BD+C projects?
MPR2 LEEDuser Forum questions and comments prior to the 09/05/17 upgrade
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Brian Bartholomew on
Did we lose access to all the MPR2 LEEDuser Forum questions and comments posted prior to the 09/05/17 upgrade?
University Participation in Utility Solar
NC-v4 EAc7:Green power and carbon offsetsposted by Rebecca Aarons-Sydnor on
We are working on a new building at a University that has an existing agreement with the utility to offset 96% of the energy used with utlity-owned solar farms, and all RECs are retired on the Univ
Electrification baseline in LEED (and James leading today's call)
posted by Nadav Malin on
Hi folks,
On today's call James Peterson will be introducing a conversation about how COVID might have changed our ways of working.