Forum quick links
adjacent spaces outside scope of work?
CI-v4 EQc9:Acoustic performanceposted by Erin Holdenried on
For LEED projects that consist of tenant space within a larger building, do they have to consider adjacencies to spaces outside the scope of work?
Low Speed High Volume Fans - Penalty in model for using?
NC-v4 EAp2:Minimum energy performanceposted by Donald Green on
We are partnering with our local energy company for an energy model as this service will provide anlaysis and incenteive back to the Owner. The project is using several low spee
Commissioning of existing equipment not in scope?
CS-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Brian Salazar on
Hi all! We received feedback from the LEED review team on Cx that I had not seen before. We have a Core & Shell building where the exisitng Domestic Hot Water heater was retained.
Coffee Talk with the Tin Knockers and Sparktricians
posted by Anne Hicks Harney on
We had so much fun at our Contractor coffee talk that I reached out to our MEP friends to see if they would set up something similar. And they have agreed to host a talk on Thursday Dece
Health and Safety Specialist requirement
Pilot-Credits EQpc44:Ergonomics approach for computer usersposted by Shanwen Hsu on
Do we need to provide Ergonomist/ Health and Safety Specialist's bio or prove of credentials?
Lighting Controls for Natatorium
NC-v4 EQc6:Interior lightingposted by Lyle Axelarris on
It seems to me that it would be inappropriate to have dimmers in a natatorium for safety reasons. Has anyone worked on this credit for a natatorium project?
Thank you
Altering On-Line Form
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Jeannie Rueter on
The majority of visitors to our project -a conference center- will not be traveling by bicycle.
Steel Framed Wall for baseline case
NC-v4.1 EAp2:Minimum Energy Performanceposted by John on
Hi folks,
I am creating wall assembly layers for baseline case. I am using DC energy code not LEED. But thought of taking help from the wisdom of this forum.
calculations
NC-v4.1 EAc5:Renewable Energyposted by Lisa Matthiessen on
Looking through credit guidance to be sure I understand the approach to calculating offsets and RECS. I see that some addenda address the Calculations section of the reference guide.