Preparing concept HVAC requirements
NC-v4 EAc2:Optimize energy performanceposted by Dina El-Sady on
Is it a must to start a simple box energy model for a new project to extract HVAC requirements to acheive a certain level of energy savings?
Parking not provided
NC-v4 LTc7:Reduced parking footprintposted by Ana Milinkovic on
Hi everybody.
I have just a simple question. If in my project parking is not provided, can I award this credit?
Test duration
Pilot-Credits EQpc57:Enhanced acoustical performance - exterior noise controlposted by Dionisio Franca on
The site noise assessment must be at least 24 hours long. Is there a similar requirement for the post-construction test?
Project located on reclaimed land
NC-v4 MPR1:Must be in a permanent location on existing landposted by Nermin Hegazy on
I would like to know what is LEED's take on developing a site which is on reclaimed land. The land for the site is not specifically claimed for the project, it has been reclaimed about 1
Insulation Question
NC-v4.1 EQc2:Low-Emitting Materialsposted by Catherine Blakemore on
If pursuing the insulation category, does roof insulation need to be included? I am assuming that it does, but the credit requirements do not specifically say so.
Certification Process
posted by Luisa Scambia on
Hello LEEDUsers,
Could you kindly confirm that my understanding of the LEED certification process/duration is correct:
LEEDv4 HD Quality Views Credit - perimeter area calculation
Healthcare-v4 EQc8:Quality Viewsposted by Tim Hemsath on
Page 740 of reference guide, second paragraph "For other areas, confgure the building foor plates such that the foor area within 15 feet (4.5 meters) of the perimeter exceeds the perimeter area req