Air Testing- Direct ReadingNC-v4 EQc4: Indoor air quality assessmentposted by HONG MEE SONG on Mar 9, 2021, 1:01 pm
Are direct reading method acceptable for the reading of parameters for Particulates, CO2, CO and Ozone? The reference... |
|
LEED v4Retail-NC-v4 EQc2: Low-emitting materialsposted by Trayana D on Oct 29, 2018, 6:06 am
Last reply: Roshni Lad, Mar 8, 2021, 1:43 pm |
|
Single-zone System (exception 'b' to G3.1.1) dealing withNC-v4 EAc2: Optimize Energy Performanceposted by Ale g on Mar 2, 2021, 8:24 am
How do you deal with exception (b) to G3.1.1? Do you apply a single-zone system (1) to spaces that have a COOLING or HEATING PEAK LOADS that differ more than 31.2 W/m2 to other spaces... Last reply: Ale g, Mar 8, 2021, 12:42 pm |
|
Compliance to Type III PS EPDNC-v4.1 MRc2: Environmental Product Declarationsposted by Melinda Orova on Mar 4, 2021, 8:02 am
Hi everyone! Hope you're doing great. I'd like to ask if the following EPD fulfills the requirement of Type III EPD PS with external verification? Thanks a lot! ... Last reply: Bipin Karki, Mar 8, 2021, 8:13 am |
|
Irrigated areas and vegetated non-irrigated areas- How to include in calculator?NC-v4 WEp1: Outdoor water use reductionposted by Erica Downs on Mar 5, 2021, 11:38 pm
The reference guide's step-by-step language says:
|
|
Snow MeltEBOM-2009 SSc2: Building Exterior and Hardscape Management Planposted by Elizabeth Felder on Jul 29, 2014, 9:37 am
We have an ice melt product that consists of CMA and Dolomite (and a proprietary blend), but the manufacturer will not release the chemical breakdown. Is it assumed that this product is non-... Last reply: Trista Brown, Mar 5, 2021, 4:15 pm |
|
Garden Sizing?Pilot-Credits SSpc82: Local food productionposted by Ty Champion on Jan 4, 2021, 10:02 am
Good morning all, For a schools project, does LEED stop ccounting garden area after the maximum 1500 SF? Thanks, Ty Last reply: Trista Brown, Mar 5, 2021, 3:11 pm |
|
Alternate approach to collecting e-waste?NC-v4 MRp1: Storage and Collection of Recyclablesposted by Renee Shirey on Sep 29, 2020, 3:08 pm
I have a campus student housing project, thus the electronics in this building would be student-provided. Since collection of e-waste is still required, I am wondering if anybody has been... Last reply: Trista Brown, Mar 5, 2021, 2:14 pm |
|
"Pilot-Credits SSpc83: Offsite Financial Support for Habitat Protection"NC-v4 SSc2: Site development - protect or restore habitatposted by Yoyo Shek on Mar 14, 2019, 6:30 amTrista Brown Project Director WSP USA LEEDuser Basic Member 449 thumbs up April 11, 2019- 8:44 pm Hi Yoyo, yes you can replace the normal SSc2 Site Development credit with Pilot Credit 83. This webpage: https://www.usgbc.org/node/5052535?return=/pilotcredits/New-Construction/v4 confirms PC83 is applicable for BDC v4 projects. And there's no distance requirement for the pilot credit, but as you point out, you have to donate to NFWF or FAS. Remember to also register for the Pilot Credit and complete all the requirements (e.g. the feedback survey and participate in the LEEDuser credit forum... Last reply: Trista Brown, Mar 5, 2021, 2:11 pm |
|
LEED Credential Maintenance and Project Participation HoursLEED Recertification: When and Howposted by Scott Edwards on Jul 10, 2020, 8:19 pm
Regarding claiming hours for working on a LEED registered project, I've seen that "Work on projects registered for LEED... certification count for 1 rating system-specific CE hour per credit... Last reply: Trista Brown, Mar 5, 2021, 2:03 pm |