Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Whole Building LCA

Schools-NC-v4 MRc1:Building life-cycle impact reduction
posted by  Nove Sol  on 

Hello all,

I have a question related to whole building LCA in LEED. For example when comparing wood building construction to Concrete Building construction.

0

Monitoring Plan

Pilot-Credits SSpc55:Bird collision deterrence
posted by  Aliesa Adelman  on 

Wondering if there has been any reviewer feedback others can share on their 3 year monitoring plan and criteria outside of the examples provided?

 

0

Master Site: Substitution credit from LEED v4 to LEED v4.1

NC-v4 WEc3:Cooling tower water use
posted by  Mario Angelo Pinoli  on 

Hi everyone, 

we registered a project as a Master Site in LEED v4 version and we would like to replace the WEc3 credit with the same credit of the LEED v4.1 version.

4
Tue Nov 8, 2022, 6:12 pm

Stripped facade

NC-v4 EQc8:Quality views
posted by  Gustavo De las Heras Izquierdo  on 

Hello,
The rating system states: "Views cannot be obstructed by frit, fibers, patterned glazing, or added tints that distort the color balance."

1
Fri Nov 11, 2022, 8:30 pm
3
Tue Nov 8, 2022, 3:21 pm

Quality views for Galleries

NC-v4.1 EQc8:Quality Views
posted by  Peter Doo  on 

Are art galleries exempt from this credit or can the requirements be modified where windows or clerestorys may provide limited views to protect the art or maximize wall space?

1
Wed Nov 16, 2022, 8:02 pm

Pollution Prevention on site

NC-v4.1 SSp1:Construction Activity Pollution Prevention
posted by  Martin Maribo  on 

Any practical examples of pollution prevention for a place to fuel vehicles on site, which is not under cover from rain?

0

ASHRAE 90.1 - 2010 Appendix G3.1.1 exception (d) applies to my project

NC-v4 EAp2:Minimum energy performance
posted by  Prabin Parajuli  on 

I am guessing this is going to be a utilization schedule. What would it look like?

1
Fri Dec 16, 2022, 12:54 pm

Material costs

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Heather Holdridge  on 

I'm working on a project where we are struggling to gather material costs from subs.  We are still working on this, but are there any guidelines for estimating costs for bigger $ ticket items

1
Tue Nov 8, 2022, 9:13 pm

Preferred Parking for Electric Vehicles

NC-v4.1 LTc8:Electric Vehicles
posted by  Catherine Blakemore  on 

Do the electric vehicle parking spaces need to be located within a certain distance of the building entrance?  If yes, what is maximum allowable distance and is this distance a radial distance

2
Mon Nov 7, 2022, 2:36 pm