We are working in a renovation project which design a new envelope. This new design defines different project floor areas.

According to AppendixG-TableG3.1.5 Building envelope -Baseline building requirement F which says "For existing envelopes, the baseline buildings design shall reflect existitng conditions prior to any revisions that are part of the scope of work being evaluated".

So it appears a doubt so, we consider two options: 

a) mantain the actual envelope with actual building; existing floor areas.

b) mantain the actual envelope with proposed floor areas. In this case the baseline floor area and proposed floor area will be diffent.

Which is your opinion? The right way?