Registering project for LEED v4 BD+C: Multi-family midrise
posted by Deborah Lucking on
The option to register a project for LEED v4 BD+C: Multi-family midrise has disappeared from LEED Online. Does anyone know what's going on?
I have contacted USGBC and not heard back.
Is a combination possible?
NC-v4 EAc7:Green power and carbon offsetsposted by Garrett Ferguson on
We have a project that purchases electricity from their local utility provider, which provides just over 33% green-e certified green power to their customers.
Infection control resistance to WaterSense fixtures
Healthcare-v4.1 WEp2:Indoor Water Use Reductionposted by Margaret Montgomery on
Has anyone run into a challenge with patient room faucets? We seem to have an infection control team that won't allow less than the 2.2 gpm flow rate, which is not WaterSense compliant.
Change of Fundamental Commissioning Agent
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Ilana Judah on
We are working on a project that is now under construction. Fundamental Commissioning was started by one party, with Enhanced Commissioning being undertaken by a second party.
Interest in a Greenbuild Debrief?
posted by Candace Pearson on
There are so many great contractor-related sessions at Greenbuild this year! I doubt I'm alone in trying to choose between sessions.
Natural ventilation in polluted cities
CI-v4 EQp1:Minimum indoor air quality performanceposted by Antonio Tenorio on
I'm working on an ID+C project located in Mexico City.
The owner wants to implement natural ventilation to save energy.
EVSE and ADA parking spaces
NC-v4.1 LTc8:Electric Vehiclesposted by Bryna Dunn on
Has anyone submitted a project that includes ADA spaces in the spaces served by EVSE? For example, if a total of 3 charging stations are required on a project, and one of those is placed at a
Approved Documentation for the California Department of Public Health General Emissions Evaluation
NC-v4.1 EQc2:Low-Emitting Materialsposted by Summer Gorder on
We are having trouble getting proper documentation from Manufacturers for this additional requirement.
Multizone or Single Zone 62.1 Calculation?
NC-v4.1 EQp1:Minimum Indoor Air Quality Performanceposted by Jon Silhol on
We are designing a TV studio that has two ventilation zones; 1) Stages, studios and 2) Auditorium for seating areas within the TV studio. There is a dedicated single zone, recirculation AHU s