Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Recertification

LEED Recertification: When and How
posted by  Simon Sue  on 

One of our EBOM projects has been submitted for review, and we'd like to confirm the list of items that needs to be tracked thereafter for the recertification in the future.

7
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Jun 13, 2011, 8:49 pm
2
Mon Jun 13, 2011, 8:49 pm

Deviation from Default TSS Removal Efficiency

NC-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Richard Gifaldi (Team Leader)  on 

I am working on a project in Germany that is using multiple buffer strips to remove TSS from runoff before it reaches a small drainage channel.

3
Fri Jun 10, 2011, 7:38 pm

Help with Documentation

NC-2009 IEQc7.1:Thermal Comfort—Design
posted by  Maya Karkour  on 

Dear all, 1) Thanks to LEED User for uploading sample documentation. This was very helpful. 2) the M&E working on the project would like to demonstrate compliance using a software program.

5
Default Avatar
Mechanical Engineer, LEED AP
GMEP Engineering
LEEDuser Basic Member
4 thumbs up
Thu Jun 9, 2011, 6:35 pm

safe, all-weather route??

Pilot-Credits PC13:Bicycle Network, Storage, and Changing Rooms
posted by  Christine Teichert  on 

what exactly constitutes a safe, all-weather route between the building entry and the network?

3
Default Avatar
Operations Manager
Abel Design Group
LEEDuser Basic Member
14 thumbs up
Thu Jun 9, 2011, 4:57 pm

Just one shower, and it won't be used for showering

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Maura Adams  on 

Our building has 1 shower that will be used primarily for occasional cleaning of stuff like muddy rubber boots... it's adjacent to an ecology lab.

5
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Thu Jun 9, 2011, 3:06 am

Are the restrooms private or public in an Office Building?

CS-2009 WEp1:Water Use Reduction
posted by  marisol cano  on 

Hello. We are doing a C&S certification for an office building.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Jun 8, 2011, 7:56 pm

MRc7 Documentation

NC-2009 MRc7:Certified Wood
posted by  Maura Adams  on 

I am confused about documentation requirements. The template states that vendor invoices are required on a line item basis... but if they're line items, they're not the original invoices.

11
Environmental Stewardship Manager
LEEDuser Basic Member
114 thumbs up
Wed Jun 8, 2011, 7:45 pm

Doors w/ FSC veneer and recycled (wood) core

NC-2009 MRc7:Certified Wood
posted by  Michael Miller  on 

As mentioned in a couple of other comments, the July, 2010, addenda revised the Calculations paragraph to include a clarification that "a product that includes multiple wood components, like a door

3
Wed Jun 8, 2011, 4:14 pm

Energy Star approach for multiple buildings

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  Erin Holdenried  on 

I am working on a LEED project that was registered under LEED EB: O&M 2008 that is obtaining one LEED rating for the campus.

3
Default Avatar
Sustainability Architect
LEEDuser Basic Member
88 thumbs up
Wed Jun 8, 2011, 3:15 pm