Forum quick links
VOC Testing
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Maya Karkour on
Hello, Do you guys know if the VOC testing could be done by the paint manufacturer or should it be undertaken by a third party ? Should the testing be done in accordance to a special standard ?
100% of energy generated by PVs at site--will it earn 19 points?
NC-2009 EAc1:Optimize Energy Performanceposted by Brooks Critchfield on
We have a project on a "campus" site with existing buildings. The Owner has installed an extensive array of PVs which are shared by buildings on this site.
questions of Install Drift Eliminators and minimum efficiencies
Pilot-Credits WEpc17:Cooling tower water useposted by Jie Zhang on
In the pdf download from usgbc.org, one of the credits requirements is 'install drift eliminators that achieve minimum efficiencies of 0.2% for counter-flow systems or 0.5% for cross-flow system'.
locker room bench?
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Erin Holdenried on
I am working on a very small renovation project that will probably have no millwork, but it does have a butcher block locker room bench that is fixed permanently to the floor.