Pre-existing Campus PV Array - Does commissioning apply?
NC-2009 EAc2:On-Site Renewable Energyposted by Heather DeGrella on
If we are allocating production from a campus PV array, in which the array is already built and outside of our LEED boundary, how do commissioning requirements apply?
Appeal Process
posted by Dennis Park on
Can we appeal multiple times for different credits? If so, are there time limits between the appeals? I ask because we have different paths we've routed to achieve our end goal.
stormwater when site is directly on the river?
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Carrie Laurendine on
site is on the river. I assume this doesn't change anything, but civil engineer asked I check to see if LEED has exceptions for this.
Qualifying Products
Pilot-Credits MRpc80:Environmentally preferable interior finishes and furnishingsposted by Thomas Hellmann on
We're preparing to submit this pilot credit for a light-duty laboratory facility.
Local Jurisdiction Approval?
NC-2009 IEQp1:Minimum IAQ Performanceposted by Marina Andrade on
Hi, What is "the local jurisdiction approval"? You know what this is? How do I get this approval? With the designer?
Qualifying energy use
NC-v4 EAc7:Green power and carbon offsetsposted by Francesco Passerini on
At p. 455 I read: “Exclude any site-generated electricity (e.g.
Status of covered outside space and Energy Modeling
NC-2009 EAc1:Optimize Energy Performanceposted by Amanda Johnson on
Hello, We are working on a mixed use project with a glass-covered outdoors space that fills the void between 3 different buildings (hotels, conference and restaurant).
Eliminating Multiple Responses From One Person - Survey Changes
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Kevin Kelly on
I have been certifying many large office buildings in NYC and would like some help on the below: I provide a survey to building occupants in multiple forms (e.g.
Partially Irrigated Site / Form
NC-2009 WEc1:Water Efficient Landscapingposted by Johanna Phelps on
I have a partially irrigated site. Under irrigation types there are three choices, drip, sprinkler and other. What should I put for the non-irrigated areas?
FF&E
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Adrienn Gelesz on
Hi, If I include FF&E in the MR calculations, is this also necessary for this credit? Thanks, Adrienn