Pre-existing Campus PV Array - Does commissioning apply?

NC-2009 EAc2:On-Site Renewable Energy
posted by  Heather DeGrella  on 

If we are allocating production from a campus PV array, in which the array is already built and outside of our LEED boundary, how do commissioning requirements apply?

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Sep 19, 2014, 10:04 pm

Appeal Process

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Dennis Park  on 

Can we appeal multiple times for different credits? If so, are there time limits between the appeals? I ask because we have different paths we've routed to achieve our end goal.

2
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Fri Sep 19, 2014, 3:08 pm

stormwater when site is directly on the river?

NC-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  Carrie Laurendine  on 

site is on the river. I assume this doesn't change anything, but civil engineer asked I check to see if LEED has exceptions for this.

2
Regional Stormwater Leader
Arcadis North America
LEEDuser Expert
144 thumbs up
Fri Sep 19, 2014, 1:48 pm

Qualifying Products

Pilot-Credits MRpc80:Environmentally preferable interior finishes and furnishings
posted by  Thomas Hellmann  on 

We're preparing to submit this pilot credit for a light-duty laboratory facility.

2
Default Avatar
Sustainable Design Manager
LEEDuser Basic Member
15 thumbs up
Fri Sep 19, 2014, 2:12 am

Local Jurisdiction Approval?

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Marina Andrade  on 

Hi, What is "the local jurisdiction approval"? You know what this is? How do I get this approval? With the designer?

4
Thu Sep 18, 2014, 5:34 pm

Qualifying energy use

NC-v4 EAc7:Green power and carbon offsets
posted by  Francesco Passerini  on 

At p. 455 I read: “Exclude any site-generated electricity (e.g.

3
Thu Sep 18, 2014, 3:41 pm

Status of covered outside space and Energy Modeling

NC-2009 EAc1:Optimize Energy Performance
posted by  Amanda Johnson  on 

Hello, We are working on a mixed use project with a glass-covered outdoors space that fills the void between 3 different buildings (hotels, conference and restaurant).

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Sep 18, 2014, 3:31 pm

Eliminating Multiple Responses From One Person - Survey Changes

EBOM-2009 SSc4:Alternative Commuting Transportation
posted by  Kevin Kelly  on 

I have been certifying many large office buildings in NYC and would like some help on the below: I provide a survey to building occupants in multiple forms (e.g.

2
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Thu Sep 18, 2014, 2:49 pm

Partially Irrigated Site / Form

NC-2009 WEc1:Water Efficient Landscaping
posted by  Johanna Phelps  on 

I have a partially irrigated site. Under irrigation types there are three choices, drip, sprinkler and other. What should I put for the non-irrigated areas?

2
Wed Sep 17, 2014, 11:15 pm

FF&E

NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Products
posted by  Adrienn Gelesz  on 

Hi, If I include FF&E in the MR calculations, is this also necessary for this credit? Thanks, Adrienn