ASHRAE 62.1-2007 in Warehouses

EBOM-2009 IEQp1: Minimum indoor air quality performance
posted by Prudence Ferreira on Jul 22, 2011, 11:12 am

We are working on a project with very large warehouses with massive roof-mounted air handling units and relatively low occupancy. A 60,000 sf facility may only have 8 workers for example. Do we...

Last reply: Julia Weatherby, Aug 24, 2011, 10:10 am

IAQ Procedure as ASHRAE 62.1 Compliance Path

EBOM-2009 IEQp1: Minimum indoor air quality performance
posted by Laura Case on Jul 26, 2011, 3:20 pm

ASHRAE specifies that the Ventilation Rate Procedure or the...

Last reply: David Hubka, Aug 24, 2011, 7:53 am

Problems with version 3 of the Form and Vot

EBOM-2009 IEQp1: Minimum indoor air quality performance
posted by Stephen Redding on Jun 20, 2011, 8:43 pm

RE: IEQp1 Form Table. Case 1: ASHRAE 62.1-2007 Ventilation Rate Procedure (LEED O&M v3)
I fill out the table based on the critical zone for that...

Last reply: David Hubka, Aug 24, 2011, 7:13 am

Lighting Power Density: ASHRAE Lighting Compliance Documentation

CI-2009 EAp2: Minimum Energy Performance
posted by elizabeth warlop on Aug 17, 2011, 2:17 pm

Hello,
Our project is a small 1300 sqft office space. The only adjustments the clients are making to the lighting is that they are adding task lighting to the newly fabricated work...

Last reply: elizabeth warlop, Aug 23, 2011, 5:57 pm

Option 4 has disappeared from the May 2011 Addenda

NC-2009 SSc4.4: Alternative transportation - parking capacity
posted by Deborah Lucking on Jun 24, 2011, 2:06 pm

Option 4, citing the ITE study is not shown in the May 2011 Addenda. Does anyone know if this was just an omission by mistake, or is this Option no longer valid? It was in the July 2010 Addenda...

Last reply: David Posada, Aug 23, 2011, 1:50 pm

other related green practices

EBOM-2009 MRp2: Solid Waste Management Policy
posted by Pablo Fortunato Suarez on Jul 5, 2010, 8:34 am

Tristan Roberts Representative Vermont House of Representatives LEEDuser Expert 11474 thumbs up July 12, 2010- 9:08 pm Your similar question is answered on the MRp1 forum. It's fine to amend the existing policy to meet the LEED targets. You will need to be in compliance for the performance period—the existing non-compliant policy won't work in this case. Log in or register to post comments Pablo Fortunato Suarez Principal ESD Consultant/Architect GreenArc Sustainable Building & Architecture LEEDuser Basic Member 253 thumbs up July 14, 2010- 5:28 am Thank you Tristan. The client actually...

Last reply: Jessica Hawley, Aug 23, 2011, 10:35 am

Is SS c7.2 actually a Construction Credit?

NC-2009 SSc7.2: Heat island effect - roof
posted by Kim Shinn on Apr 22, 2010, 5:56 pm

During design review, request for additional information on actual installed materials.

I upload the specification section showing requirement for...

Last reply: Susann Geithner, Aug 23, 2011, 9:51 am

Parking garage under building

NC-2009 SSc7.1: Heat island effect - nonroof
posted by AshLee Eustace on Aug 2, 2011, 5:29 pm

I have a building with the first two floors are made up of a parking garage, and the floors above are condominiums. For this credit, does the...

Last reply: Jean Marais, Aug 23, 2011, 2:58 am

100 ft wetlands setback

CS-2009 SSc1: Site Selection
posted by Ben Tucker on Aug 22, 2011, 9:37 am

Our site is previously developed and we will be performing a major renovation on the existing building. We appear to meet all the criteria for this credit with the exception perhaps of the...

Last reply: Susann Geithner, Aug 22, 2011, 5:30 pm

Avoidance of Chemicals of Concern in Building Material

General forums
posted by Tom Lent on Aug 1, 2011, 1:54 pm

I'm very pleased to see this credit (the last one in Table 2 above) added to the mix. I think it represents an important advance for the LEED system in bringing healthy materials to building...