Batteries - annual actual diversion performance verification

EBOM-2009 MRc7:Solid Waste Management—Ongoing Consumables
posted by  Jean Marais  on 

Does anybody have a practicle way in which they "verify" their performance for Battery diversions? In the EU it is law to seperately dispose of batteries.

4
Thu Jan 8, 2015, 4:23 pm

revising LEED boundary on old project (LEED NCv2.2)

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Courtney Royal  on 

This project is a park project in NYC. The original completed bid set was issued in 2009, and the LEED boundary did not include parking or additional infrastructure.

4
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Thu Jan 8, 2015, 12:30 pm

Walk-off mats

NC-v4 EQc2:Low emitting materials
posted by  Caroline PIN  on 

Firstly, a happy New Year to each and every one of you. My question is about 3 walk-off mats located at the entrance of the building. Are mats concerned with COV requirement ?

2
Principal
Sustainable Integration LLC
LEEDuser Basic Member
12 thumbs up
Thu Jan 8, 2015, 8:14 am

Medical Center MRI, CT Scan Rooms

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Sara Zoumbaris  on 

Although the October 2013 Matrix, does not allow any patient rooms to be without daylighting/ views, I believe these rooms could be eliminated due to the nature of their process.

2
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Wed Jan 7, 2015, 10:26 pm

Mid Review Clarification of LEED Project Boundary

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Nicholas Klever  on 

We have submitted an addition project for Design and Construction review under the new construction and renovation system.

4
Default Avatar
Intern Architect
Bailey Edward Architecture
LEEDuser Basic Member
0 thumbs up
Wed Jan 7, 2015, 9:41 pm

credit forms not working

General forums
posted by  Lyle Axelarris  on 

When I try to open a credit form, I get an error message at the top of the pdf window: "This PDF document contains forms. The filing of form fields is not supported".

3
Building Enclosure Consultant
BPL Enclosure
LEEDuser Basic Member
58 thumbs up
Wed Jan 7, 2015, 9:19 pm

Microfiber cleaning

EBOM-v4 EQc7:Green cleaning - products and materials
posted by  Louise Taillon  on 

are microfiber cleaning cloths, pads, tools included in the calculation for cleaning products and materials? Where does the use of microfiber fit-in to the green cleaning policy?

3
Wed Jan 7, 2015, 8:48 pm

Best way to document a building with multiple phases

LEED Rating System Selection
posted by  Mike Stopka  on 

Hello I am currently working on a mixed-use campus project. This project will only be 1 building, however construction will be done in two phases.

2
LEED Project Reviewer, LEED AP BD+C, Senior LEED Specialist
Certifications Department Manager, Epsten Group, Inc.
LEEDuser Basic Member
26 thumbs up
Wed Jan 7, 2015, 8:32 pm

Verrry interesting.....but.....

General forums
posted by  Abena Darden  on 

And some of us may remember how Henry Gibson ended that observation. Our entire office must have missed the announcement from USGBC. Or....was there one? I'd be interested in knowing.

3
LEED AP BD+C, O+M, Green Globes Professional
JLL
LEEDuser Basic Member
112 thumbs up
Wed Jan 7, 2015, 7:53 pm

Regularly occupied space

NC-2009 IEQc8.2:Daylight and Views—Views
posted by  Michael Beattie  on 

The existing building renovation I'm working on has several pathways from door to stairway, through the open office environment.

3
Default Avatar
Christner Architects
LEEDuser Basic Member
7 thumbs up
Wed Jan 7, 2015, 5:02 pm