IAQ managent- real live pictures

CI-2009 IEQc3.1: Construction IAQ management plan - during construction
posted by Susann Geithner on Nov 15, 2011, 5:48 pm

Here are some real live applications for...

UNUSUAL AND UNIQUE PROCESS LOAD

NC-2009 EAp2: Minimum Energy Performance
posted by Vindio Corro on Nov 15, 2011, 1:51 pm

We are working in a Project which is a unique green energy research facility (the second to be built in the World), and must receive the LEED Silver standard complying with the South Carolina...

Last reply: Marcus Sheffer, Nov 15, 2011, 2:25 pm

PC 34- Design for Adaptability

Pilot-Credits PC34: Design for Adaptability
posted by albert kovacik on Nov 15, 2011, 2:01 pm

We were on the cusp of Gold level until our review came back with several points deducted from our energy model. Our Green Rater suggested that we look into the Pilot Credit program and felt...

PC 29- Housing & Job Proximity

Pilot-Credits PC29: Housing and Jobs Proximity
posted by albert kovacik on Nov 15, 2011, 1:36 pm

We were on the cusp of Gold level until our review came back with several points deducted from our energy model. Our Green Rater suggested that we look into the Pilot Credit program and felt...

75% COMPLIANCE area

EBOM-2009 SSc7.2: Heat island effect - roof
posted by Danna Sigal on Aug 30, 2010, 4:36 pm

Our roof is 100% covered with White EPDM material. On top of that material are the HVAC units. There are also a couple of vents and a hatch opening for roof access. All these things add up to...

Last reply: Tristan Roberts, Nov 15, 2011, 1:20 pm

Cumulative Facade Intrusion?

Pilot-Credits PC14: Walkable Streets
posted by Kimberly Frith on Sep 16, 2011, 3:36 pm

Our project has two facades extending along sidewalks. Going by the credit requirements, we cannot have more than fifty feet of blank facade. One of the facades has 54 feet of blank length, while...

Last reply: Chris Marshall, Nov 15, 2011, 12:38 pm

Campuswide and Multi Building Documentation

NC-2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
posted by Brian Moran on Jul 7, 2011, 2:46 pm

Does anyone have experience demonstrating compliance for campuswide or multiple buildings? We would like to document this credit for campuswide submission. The campus has a policy thta bans...

Last reply: Deborah Lucking, Nov 15, 2011, 12:26 pm

Alternative Compliance path for international projects

NC-2009 IEQc2: Increased Ventilation
posted by Susann Geithner on Nov 15, 2011, 11:11 am

The USGBC has published a draft for additional guidance for international projects. That includes alternative compliance paths and even additional LEED online forms for international projects....

Alternative Compliance path for international projects

NC-2009 IEQc1: Outdoor Air Delivery Monitoring
posted by Susann Geithner on Nov 15, 2011, 11:08 am

The USGBC has published a draft for additional guidance for international projects. That includes alternative compliance paths and even additional LEED online forms for international projects....

ANTE Room

NC-2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
posted by Omar Elrawy on Oct 25, 2011, 8:31 am

I'd like to know if I can fulfill the prerequisite, without constructing an ANTEROOM? and if a double door can be an acceptable alternative or not?

thanks

Last reply: Susann Geithner, Nov 15, 2011, 11:03 am