Buying & selling RECsSchools-2009 EAc2: On-Site Renewable Energyposted by Renee Shirey on Aug 31, 2011, 3:46 pm
If the RECs are sold (solar RECs) is there a requirement that the RECs HAVE to be solar, or can they be any kind of RECs (wind)? I am asking, because there seems to be a large difference in... Last reply: Marcus Sheffer, Dec 9, 2011, 10:15 am |
|
local code IEQ requirementsNC-2009 IEQp1: Minimum indoor air quality performanceposted by Mike W. on Dec 2, 2011, 2:58 pm
In New York the local code does not follow IBC or ASHRAE 62.1. It requires 20cfm/person and 0cfm/sf. How do I go about proving to USGBC that the ventilation levels are adeqaute, when all the... Last reply: Roger Chang, Dec 9, 2011, 9:17 am |
|
EA Cre 3- DES commissioningGeneral forumsposted by Adam Targowski on Aug 4, 2011, 10:55 am
Does anyone know how to deal with Commissioning of District Energy System (... Last reply: Scott Bowman, Dec 8, 2011, 12:50 pm |
|
No Recycling Program...yetEBOM-2009 MRc6: Solid waste management - waste stream auditposted by SIG - Sustainability Main Account on Nov 1, 2011, 3:03 pm
Senario: Building not currently recycling. Have arranged waste hauler to begin as soon as construction ends (and demolition dumpster is off loading dock in urban site). Question1: Last reply: Dan Ackerstein, Dec 8, 2011, 12:34 pm |
|
Fish as biological controlEBOM-2009 SSc6: Stormwater Quantity Controlposted by SIG - Sustainability Main Account on Dec 2, 2011, 2:05 pm
At an office park, the stormwater management control is a large retention pond that is managed by an aquatic service vendor. They provide inspection logs for the LEED documentation. Recently,... Last reply: Amy Rider, Dec 8, 2011, 12:10 pm |
|
Design for AdaptabilityPilot-Credits PC34: Design for Adaptabilityposted by Jeffrey Lewis on Dec 8, 2011, 11:54 am
As a Senior Building, this credit was pretty much a given. We have designed our entire building to be accessible and all of our apartment units to be adaptable, as it is extremely likely that at... |
|
Consistency, Consistency, ConsistencyGeneral forumsposted by April Ambrose on Dec 8, 2011, 11:16 am
I think my main issue with this announcement is the lack of consistency in the way that USGBC/... |
|
How many survey answers are required?NC-2009 IEQc7.2: Thermal comfort - verificationposted by Maria Porter on Oct 5, 2011, 7:06 am
I think this subject has been discussed before but I can’t find the answer. How many percent of building occupants must answer the survey for it to be a valid result? Is there a limit, or should... Last reply: Cam Fitzgerald, Dec 8, 2011, 10:09 am |
|
WE Pr1- What does ADO stand for in the Process Water Use Sect?NC-2009 WEp1: Water Use Reductionposted by Edna Bartolomei-Diaz on Jul 26, 2011, 6:12 pm
We are using LEED 2009 for Retail: NC+MR templates, for one of our projects. In WE Pre-requisite 1Template, there is... Last reply: Paola Figueiredo, Newton Figueiredo, Dec 8, 2011, 9:49 am |
|
Is Imperviousness = Runoff coefficient?NC-2009 SSc6.1: Stormwater design - quantity controlposted by Maya Karkour on Nov 1, 2010, 5:12 am
Hello, Can I presume that the imperviousness of a site is less than 50% if the overall runoff coefficient is less than 0.5 ? Apologies if the answer is obvious but I am not an... Last reply: Petra Hajná, Dec 8, 2011, 9:40 am |