NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Miriam Ramirez Baumgarten on
Hi, we have a project where the first 4 floors are retail (shopping center, including bowling and movie theatres). Because of the design of the shopping mall, most retail spaces do not have views
NC-v4 LTc2: Sensitive land protection/Wetland Protection
NC-v4 LTc2:Sensitive land protectionposted by Robyn Dowsey on
Is there a precedent anywhere for getting this credit with wetland mitigation plan where small inactive wetlands were included in the project footprint but an equal or greater wetland area was purc
CHP Modeling guidance
NC-v4 EAp2:Minimum energy performanceposted by Paula Rantanen on
Our project building is served by CHP system which generates both heat energy and electricity.
SSpc14 - Walkable project site
Pilot-Credits PC14:Walkable Streetsposted by Robert Cannellos on
I have a project in Miami that meets all the criteria of the SSpc14 credit, however I have a question to define the following requirement - "When a Façade extends along a sidewalk – no more than
hand-watering?
NC-2009 WEc1:Water Efficient Landscapingposted by Erin Holdenried on
I am working on a project that has courtyard with planters which will be planted with species that have very minimal watering requirements. The planters will be hand-watered when needed.
Al Cladding - Testing Requirements
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Keerthi Ratnayake on
Hi, Does Al cladding used for interior walls need to be tested or is it qualified for the credit without testing? Thanks
Residential Equip in a Commercial Context
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Michelle Rosenberger on
My CI project has a full blown café.
Option 2
NC-v4 SSc4:Rainwater managementposted by henry nguyen on
Hello, I wonder how should I understand Opt.2 BD+C Rain water Mgmt credit. "Manage on site the annual increase in runoff volume from the natural land cover condition to the post-developed conditio
On-site CHP Modeling
NC-2009 EAp2:Minimum Energy Performanceposted by MURAT DOĞRU on
Dear all, We are modeling a hospital building which is served by two 800kW CHP systems. The CHP systems are dedicated to this building only, i.e.
Asbestos Remediation
NC-2009 SSc3:Brownfield Redevelopmentposted by Jeannie Rueter on
The first phase of our Job Corps project was to construct a new cafeteria on campus. The second phase is to demolish the old cafeteria. The old cafeteria has asbestos in it.