Forum quick links
Battery Disposal
EBOM-2009 MRc7:Solid Waste Management—Ongoing Consumablesposted by Claire Bannister on
Sorry if this is a repetitive question, but just need clarification- we are meant to be weighing batteries such as AAAs and AAs prior to disposal? and same with light bulbs?
Composting
EBOM-v4 MRc4:Solid waste management - ongoingposted by Claire Bannister on
Are existing buildings that are not schools still able to get a points for composting food waste? Can it be included in the calculations of ongoing solid waste?
Rainwater Management
NC-v4 SSc4:Rainwater managementposted by Hadar Farjo on
We our developing a brownfield site.There is no annual increase in runoff volume from the pre development cover condition to the post developed condition.
Retro-Enhanced Commissioning
NC-2009 EAc3:Enhanced Commissioningposted by Christian Pegher on
Our project is on hold until the fall. The construction documents are done, and the owner just hired a CxA. They'd like to have the CxA go back through the documents now and provide feedback.
Elevated buggy paths qand bridges for resort projecct
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by John Covello on
Hello, I am dealing with a hotel project that will have elevated buggy paths connected to buildings for a second and third tier of buildings.
How can I develop leed certificate service in my country?
NC-v4 EQp1:Minimum indoor air quality performanceposted by erdem özkan on
We provide Leed certificate and green building service but how are we developing this process in Turkey?
Cooling Tower
CI-2009 SSc1:Site Selectionposted by Kristopher Croghan on
Our CI client owns the building they're in and are looking for additional water savings, beyond the water savings as outlined in LEED CI WEc1.
Certify only one floor among three floors that are rented
CI-v4 MPR2:Must use reasonable LEED boundariesposted by Diana Nezamutinova on
Would you please advise if one newly acquired floor of a 3-floor office eligible to get certified under LEED v.4 Commercial Interiors (see details below)? - A company XYZ has been renting 2 adjac
Arc Skoru update
posted by Bill Swanson on
Hey Tristan, any update on this LEED Dynamic Plaque? Last year there was a lot of pressure made to convert as many LEED credits into "dynamic" points for use in this plaque.
LEED Certification for a portion of a building
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Eesmyal Santos-Brault on
Hi there, I am working on a 17 storey residential project with social housing on the podium levels (3 storey). The social housing part has a separate entrance, mechanical and electrical systems.