We our developing a brownfield site.There is no annual increase in runoff volume from the pre development cover condition to the post developed condition. The site runoff will be discharged through storm pipe to an existing Pond (outside the project LEED boundary) that was designed to accommodate and manage the runoff. Do will be able to achieve the credit based on this.