Forum quick links
Athletic Track
NC-2009 SSc2:Development Density and Community Connectivityposted by Erica Downs on
Has anyone successfully used an Athletic Track as a "fitness center" option? Definitely open the public and seems like it should fly. Thanks!
Compact Car Spaces
CS-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Allen Cornett on
I have a project that some of the parking spaces that are the shortest distance to the elevator bank are spaces for compact cars.
v4 - SSc6 Project vs Lighting boundary
posted by Bill Swanson on
There appears to still be confusion on the differences between the Project Boundary and the Lighting Boundary. The Project boundary is the same as shown in every other credit.
Flooring Minimum
CS-v4 EQc2:Low emitting materialsposted by Michelle Rosenberger on
We have a CS warehouse that is struggling to achieve certification that will build out only restrooms and has no identified tenant to execute a lease agreement with.
Eligible for Exemplary Performance Credit?
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Owen Hyne on
We anticipate meeting/exceeding requirements for SSc6.1 "Quantity Control", but not SSc6.2 "Quality Control".
Appying the requirements in a High Rise
Pilot-Credits EQpc78:Design for active occupantsposted by Donald Green on
I saw a couple comments about applying the requirements of this Pilot Credit in a building other than 2 to 3 stories.
Open parking under the building
CS-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Rasita Masalskyte on
Dear all, We have a case where an open parking garage is located on the ground floor (under the building). Apparently, no exchaust system can be applied in this case.
Campus Projects, overlapping boundaries
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Michele Helou on
MPR Supplemental Guidance page 16 states that projects in phases may have an overlapping boundary. Let's say phase 1 included shared drive and parking and it does NOT earn SSc7.1 or SSc8.
How to specify for v4 LEED compliance
Data-Centers-NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Lissa Spitz on
Any recommendations on specs for the v4 MR credits? For example, we used to say 10% recycled materials required.
Single certification for physically distinct structures
NC-v4 MPR2:Must use reasonable LEED boundariesposted by NAMRATA GUPTA on
We are pursuing LEED for a hotel cum resort project with 80 individual villas plus main admin block, spa block, utlity blocks etc.