Forum quick links
Credits Applicable for Product-Services?
EBOM-v4.1 MRc1:Purchasingposted by Marieke Head on
My client owns a product-service company that makes (charged) rechargeable batteries available to their clients on a subscription model, whereby my client maintains ownership of the batteries.
Parksmart measures
NC-v4 INc1:Innovationposted by Norbert Szircsak on
Dear All,
The innovation strategy 1 under Innovation: Parksmart Measures looks a good fit for our project, and I think generally for many projects.
How can an expansion project with zero indoor water use scope comply with WEp2 requirement to reduce potable water use >20%?
Warehouses-NC-v4 WEp2:Indoor water use reductionposted by Blake Jackson on
I'm working on a 455,000gsf expansion of an existing warehouse/stroage facility.
Is string lighting exempt from the Light Trespass/Uplight requirements.
NC-v4 SSc6:Light pollution reductionposted by Summer Gorder on
Hi, we have a project where they are using string lighting to light a pathway.
Does type of signage matter?
CI-v4 EQp2:Environmental tobacco smoke controlposted by Edgar Arevalo on
Does it matter the type of signage that's displayed at the entries of the building? I have a contractor who placed a paper sign behind the glass door of the main entrance, which clearly
Diverse uses outside the project boundary/ tenant fitout area but within the same building
CI-v4 LTc2:Surrounding density and diverse usesposted by Ranya Metwalli Shields on
Our project is a retail tenant located within a mall.
Difference between v4 and v4.1
Pilot-Credits EApc161:Electrification ACP: Energy Simulation Performance Pathposted by Camilo Velez on
Good evening,
I have been reading about this ACP, but there are a couple of questions that I still have regarding the applicability:
CARE(Carbon Avoided Retrofit Estimator)
posted by Teresa Jan on
Anyone know what stages does CARE include? Does it include B1-5, C1-4 or D?
Thank you!
Can a non-revenue listed meter (or PTs and CTs integrated with the BAS) be utilized for credit compliance?
Healthcare-v4.1 EAc3:Advanced Energy Meteringposted by Keith Robertson on
For low-level metering of loads, greater than 10% can a non-revenue listed meter (or PTs and CTs integrated with the BAS) be utilized to collect data in accordance with obtaining&nbs
Option 1 Path 2/3 - Natural Ventilation and DES
CS-v4 EAp2:Minimum energy performanceposted by Azra on
Hello,
we got a kind of an unusal situation here, at least for us.