Topic | Recent |
---|---|
University/Campus SettingPilot-Credits SSpc129: Comprehensive Compostingposted by Atlas Turner on Mar 30, 2023, 3:38 pm
Hi All, Our project is on a University Campus. The campus has already implemented onsite comprehensive composting and has an active contract with the compost hauler. The campus is not... Last reply: Kristen Fritsch, Feb 5, 2024, 5:32 pm |
|
beyond the 25 feet boundary and neighboring businessCI-v4 EQp2: Environmental tobacco smoke controlposted by Edgar Arevalo on Dec 6, 2023, 4:10 pm
There is a library project I'm working on which has a policy of no smoking within 100 feet from the entrance. The thing is it is next to neighboring business that are are within the 100 feet and... Last reply: Edgar Arevalo, Feb 5, 2024, 11:44 am |
|
Credits Applicable for Product-Services?EBOM-v4.1 MRc1: Purchasingposted by Marieke Head on Feb 5, 2024, 8:45 am
My client owns a product-service company that makes (charged) rechargeable batteries available to their clients on a subscription model, whereby my client maintains ownership of the batteries.... |
|
Is string lighting exempt from the Light Trespass/Uplight requirements.NC-v4 SSc6: Light Pollution Reductionposted by Summer Gorder on Feb 2, 2024, 7:04 pm
Hi, we have a project where they are using string lighting to light a pathway. Is string lighting exempt from the Light Trespass/Uplight requirements due to the low wattage based on ASHRAE or... Last reply: Glenn Heinmiller, Feb 3, 2024, 4:37 pm |
|
How can an expansion project with zero indoor water use scope comply with WEp2 requirement to reduce potable water use > 20%?Warehouses-NC-v4 WEp2: Indoor water use reductionposted by Blake Jackson on Dec 1, 2023, 2:44 pm
I'm working on a 455,000gsf expansion of an existing warehouse/stroage facility. The existing facility won't be renovated, spare for the demolition of an existing exterior wall to provide... Last reply: emily reese moody, Feb 3, 2024, 1:22 pm |
|
Initial Water StorageNC-v4 SSc1: Site assessmentposted by JIm Rozema on Aug 24, 2018, 11:38 am
Can you provide the definition of the Estimated TR-55 Initial Water Storage? This term is not defined in TR-55. Last reply: Thomas Lagarde, Feb 2, 2024, 5:50 pm |
|
Does type of signage matter?CI-v4 EQp2: Environmental tobacco smoke controlposted by Edgar Arevalo on Feb 2, 2024, 5:13 pm
Does it matter the type of signage that's displayed at the entries of the building? I have a contractor who placed a paper sign behind the glass door of the main entrance, which clearly states... |
|
Difference between v4 and v4.1Pilot-Credits EApc161: Electrification ACP: Energy Simulation Performance Pathposted by Camilo Velez on Feb 1, 2024, 10:12 pm
Good evening, I have been reading about this ACP, but there are a couple of questions that I still have regarding the applicability: ASHRAE 90.1 version... |
|
Carbon Offsets & Annual deliveryCS-v4 EAc7: Green power and carbon offsetsposted by Sustainability & Commissioning on Jan 31, 2024, 4:31 pm
Hi all, On one of my Core & Shell projects, the quantity of Carbon offsets required seems to be so small that the suppliers are not willing to contract for an annual supply of the... Last reply: Marcus Sheffer, Jan 31, 2024, 5:35 pm |
|
Modeling Proposed DHW with InsulationNC-v4 EAp2: Minimum Energy Performanceposted by Rajat Wadhwa on Jan 31, 2024, 2:07 pm
Hi I am Modeling a... Last reply: Marcus Sheffer, Jan 31, 2024, 5:32 pm |