Forum quick links
Receipt Proof Requirements
NC-2009 MRc3:Materials Reuseposted by jupiter luner on
I wanted to clarify something that I recently heard from a contractor on a LEED project.
Is Athena Impact Estimator databses is recommende for South Asia
Pilot-Credits MRpc63:Whole building life cycle assessmentposted by Malan Jayawickrama on
I want to know whether LEED is accepting the results of whole building LCA conducted by using Athena Impact Estimator for a Building in Sri Lanka.(Since it is only for North America) Or else what
absence of material in a category
NC-v4 EQc2:Low emitting materialsposted by Jens Apel on
What if there is no material in a certain category, e.g. composite wood?
Preferred Parking Requirement
CI-v4 LTc5:Reduced parking footprintposted by Patty Lloyd on
For our project, 60% below baseline for our building type would be 30.33 parking spots.
APPA custodial audit
EBOM-2009 IEQc3.2:Green Cleaning—Custodial Effectiveness Assessmentposted by Minh Le on
How to calculate the average score for space type ?
eQUEST pros/cons
posted by Douglas Flandro on
Can you comment on successful ways you have used eQUEST and pitfalls you have seen? We are considering training our architects to use it for early building analysis on all projects.
Data Center Minimum Requirement of 2%
NC-v4 EAp2:Minimum energy performanceposted by Amine Zeidane on
Hello,
Ventilation calculation square footage boundary
NC-2009 IEQp1:Minimum IAQ Performanceposted by Melissa Mikulka on
We have a project that contains a recycle bin storage area within a corridor. Do the exhaust calculations have to include the entire corridor space or can we designate an area around the
Recertification - Survey - How Often?
EBOM-v4 LTc1:Alternative transportationposted by Michelle Bracewell-Musson on
Hello,
Pre Fab Building Compliance
NC-v4 EQc2:Low emitting materialsposted by Kristen Magnuson on
Is it still possible to get 3 points for 5 compliant credit categories, if the building is entirely constructed off-site and then brought to the site and assembled?