Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Oct 26, 2018, 6:38 am

Crushed/Decomposed Granite

Schools-2009 SSc7.1:Heat Island Effect—Nonroof
posted by  Danielle Dunn  on 

I see that this question has been asked previously but I received a comment back that our documentation mention decomposed granite but didn't provide and SRI.

1
Fri Oct 26, 2018, 3:14 pm

LEED C&S (sans C?)

CS-v4 MPR1:Must be in a permanent location on existing land
posted by  Thomas Gibbons  on 

Hi folks,

Have a question that I believe relates to Interpretation #10102 and incomplete spaces (though I’m open to suggestions if I’m off-base). 

0

CxA contract

CI-2009 EAc2:Enhanced Commissioning
posted by  Noriko Nagazumi  on 

Hi all, From the LEED Online form: "Upload EAc2-2.

2
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Thu Oct 25, 2018, 8:17 pm

Ergonomics approach for computer users

Retail-CI-v4 INc1:Innovation
posted by  Anna Scade  on 

I am attempting the Ergonomics approach for computer users Pilot credit and I am confused about what exactly needs to be provided to confirm that an Ergonomist or Health and Safety Specialist was u

1
Fri Feb 10, 2023, 5:09 pm

social equity within the supply chain

NC-v4 MRc4:Building product disclosure and optimization - material ingredients
posted by  Dennis Daniel  on 

We supply floor covering for LEED v.4 projects. The company I work for has a Code of Conduct that is based on the 10 Principles  of the UN Global Compact.

1
Fri Oct 26, 2018, 3:42 pm

Gross Floor area Question

CI-v4 EQc4:Indoor air quality assessment
posted by  Nancy Henderson  on 

We have a tenant with several full floors being built out in a new core and shell building.  Does the gross SF for the purpose of the flush out need to include what would be considered core sp

1
Thu Oct 25, 2018, 6:45 pm

Forum moderation questions and feature requests

BITuser
posted by  Dennis Palko  on 
  1. How can an Editor delete, hide or updated posts that others create.  We need to take down some of the test posts but there may be cases where something posted is incorrect or not approp
6
Default Avatar
Senior Technical Project Manager, Finance & Operations | Salesforce Administrator
Southface
LEEDuser Premium Member
0 thumbs up
Thu Oct 25, 2018, 2:58 pm

Membrane Primer VOC – LEED V4 – Healthcare

Healthcare-v4 EQc2:Low emitting materials
posted by  Rebecca Barr  on 

Hi there, we are a fabricator and installer of architectural metal wall panel systems and I was looking for some insight into VOC levels and air and vapour membrane adhesive.  We typically use

0

Select system for the Baseline building according ASHRAE 90.1 -2010 - Proposed wiht Heat pump

NC-v4 EAc2:Optimize energy performance
posted by  Konstantina Kalliakoudi  on 

Hello,

I have following questioning:

My proposed building is nonresidential 710.000 ft2 and the Heating/ Cooling production is made with Chillers and Heat pumps.