MRc1-Construction Credit - Option 4
NC-v4 MRc1:Building life-cycle impact reductionposted by Konstantina Kalliakoudi on
Hello to all,
Crushed/Decomposed Granite
Schools-2009 SSc7.1:Heat Island Effect—Nonroofposted by Danielle Dunn on
I see that this question has been asked previously but I received a comment back that our documentation mention decomposed granite but didn't provide and SRI.
LEED C&S (sans C?)
CS-v4 MPR1:Must be in a permanent location on existing landposted by Thomas Gibbons on
Hi folks,
Have a question that I believe relates to Interpretation #10102 and incomplete spaces (though I’m open to suggestions if I’m off-base).
CxA contract
CI-2009 EAc2:Enhanced Commissioningposted by Noriko Nagazumi on
Hi all, From the LEED Online form: "Upload EAc2-2.
Ergonomics approach for computer users
Retail-CI-v4 INc1:Innovationposted by Anna Scade on
I am attempting the Ergonomics approach for computer users Pilot credit and I am confused about what exactly needs to be provided to confirm that an Ergonomist or Health and Safety Specialist was u
social equity within the supply chain
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Dennis Daniel on
We supply floor covering for LEED v.4 projects. The company I work for has a Code of Conduct that is based on the 10 Principles of the UN Global Compact.
Gross Floor area Question
CI-v4 EQc4:Indoor air quality assessmentposted by Nancy Henderson on
We have a tenant with several full floors being built out in a new core and shell building. Does the gross SF for the purpose of the flush out need to include what would be considered core sp
Forum moderation questions and feature requests
posted by Dennis Palko on
- How can an Editor delete, hide or updated posts that others create. We need to take down some of the test posts but there may be cases where something posted is incorrect or not approp
Membrane Primer VOC – LEED V4 – Healthcare
Healthcare-v4 EQc2:Low emitting materialsposted by Rebecca Barr on
Hi there, we are a fabricator and installer of architectural metal wall panel systems and I was looking for some insight into VOC levels and air and vapour membrane adhesive. We typically use
Select system for the Baseline building according ASHRAE 90.1 -2010 - Proposed wiht Heat pump
NC-v4 EAc2:Optimize energy performanceposted by Konstantina Kalliakoudi on
Hello,
I have following questioning:
My proposed building is nonresidential 710.000 ft2 and the Heating/ Cooling production is made with Chillers and Heat pumps.