Forum quick links
Clark Dietrich "Separate Product" Counts for EPDs/HPDs
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Jesse Hunt on
Hey folks,
Product Environmental Profile - PEP
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Johanna Scogin on
I have a PEP for a recessed floor box, and it looks similar to an EPD, but I wasn't sure if LEED would count this.
Thanks!
Calculations needed for the whole project or each space?
CI-v4 EQc4:Indoor air quality assessmentposted by Katarzyna Toczynska on
Hi everyone!
Should a non-regular garage be included within LEED boundary?
NC-2009 MPR3:Must use a reasonable site boundaryposted by R.L. Bowen on
I am working on a 15,500 sq.ft kennel project in Cleveland, Ohio, that has a detached garage.
Bicycle racks distance when in garage
CS-v4 LTc6:Bicycle facilitiesposted by David Lazaro on
When requiring bicyle racks are 30 metres from any functional entry to the building, what is the ruling regarding basements?
Option 3. building and material reuse
CS-v4 MRc1:Building life-cycle impact reductionposted by Guillaume Rose on
Hi,
I would like to know how to count the surface of material reused.
FF& E - Multi Residential High End Apartments
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Erika Duran on
Are kitchen cabinets considered FF&E? They are included with the apartment when you purchase it, but I wouldnt consider them part of the base building elements. thanks
Bermuda Grass - Native & Adaptive Plant
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by SAMY Chamy on
Dear Concern:-
1/4 mile radius cuts through buildings....
NC-v4 LTc4:Surrounding density and diverse usesposted by Alara Brinton on
If the edge of my 1/4 mile radius cuts halfway through a building, should I only be counting half the area of the building in my calculations or can I include the whole building?
Energy Performance Calculator - Group Approach
NC-2009 EAp2:Minimum Energy Performanceposted by Praveenbabu Rajkumar on
Hi All,
We are working in LEED NC v2009 project which is having multiple buildings and the project is going Group approach method.