Forum quick links
Innovative and impactful new HVAC equipment?
posted by Nadav Malin on
HI MEP Leaders,
Sample purchasing plan
EBOM-2009 MRc4:Sustainable Purchasing—Reduced Mercury in Lampsposted by Sara Goenner Curlee on
I'm looking for sample purchasing plan to use for ID credit with NC. Any ideas?
Overall Approach to LEED Application Process
EBOM-v4.1 EAp1:Energy Efficiency Best Management Practicesposted by Colin Hulyk on
I have done quite a bit of research on the GBCI website and looked at the LEED requirements, but I am still having a difficult time figuring out the overall scope of applying for LEED certification
Option 3 flexible lighting control system required documentation
CI-v4 MRc2:Interiors life-cycle impact reductionposted by Alara Brinton on
I'm not entirely sure what the LEED online form/template means in regards to calculations for flexible lighting control system.
Water Restoration Certificates
Pilot-Credits WEpc110:Water Restoration Certificates®posted by Renee Azerbegi on
This is a straight forward pilot credit with benefits beyond the project boundary to various watersheds. I recommend projects pursue it.
Tally LCA
posted by Kate Bubriski on
We are attempting to use Tally on a couple projects and are wondering how others are using the tool in their design process.
Outdoor Water Feature (decorative water fountain)
NC-v4 WEp1:Outdoor water use reductionposted by Sophie Kerr on
Are exterior water features included in outdoor water calculations?
Submit Option 2 for a base building with certification pending??
CI-v4.1 IPc1:Integrative Processposted by Erica Downs on
Our CI project would like to follow v4.1 Option 2: Select a LEED Certified Building. The CI project is located in a LEED-registered C&S project, but the base building is sti