Forum quick links
Biophilia and Renovations
Pilot-Credits EQpc123:Designing with Nature, Biophilic Design for the Indoor Environmentposted by Vanessa Hostick on
Are there any metrics available based on case studies for the pilot credit or related WELL criteria that venues or spaces which renovate using the biophilia concepts rent quicker or have a greater
Infra-red electronic basin mixer
CS-v4 WEp2:Indoor water use reductionposted by Hatice G. on
Dear all,
Withdrawal of Appeal?
posted by shashank gangil on
Hi
Matter Build - materials management tool?
posted by Maria Papiez on
Hello, All. Do we have folks in the group who helped develop Matter - a material management tool? With its direct connection to Mindful Materials, it would be great to gain some insight
ASHRAE 5.4.3.4 vestibules
NC-v4 EAp2:Minimum energy performanceposted by Agnieszka Rylska on
Section 5.4.3.4 of ASHRAE 90.1-2010 requires enclosed vestibules at building entrances ("Building entrances that separate conditioned space from the exterior shall be protected with an enclosed ves
Interior Cross Contamination Prevention (Hazardous Gases Spaces)
CI-v4 EQc1:Enhanced indoor air quality strategiesposted by Giovani Bernal on
I'm working on a project that will pursue LEED certification, catergory is Retail.
Emissions Documentation
NC-v4.1 EQc2:Low-Emitting Materialsposted by alix fox on
There are several materials in my calculator for which I have VOC information, but I cannot find a GreenGuard Certificate- are there other resources or documents available to help meet the criteria
Baseline for curtain wall
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
A curtain wall is made of glazed parts and opaque parts (spandrels). In the baseline model, how much shall the façade be glazed? Are spandrels considered as an opaque wall or as a frame?
Leakage Test Requirement
NC-v4.1 EQp2:Environmental Tobacco Smoke Controlposted by Mario Angelo Pinoli on
Hi,
I have an high rise residential project and the property wants to permit people to smoke on the balconies.
Campus bus line must provide transportation to the public
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Dominique Serrette on
The project is on a campus with access to several campus bus lines within one-quarter mile of the project.