Log in
Forum
Topic

HOV vs. Carpool/Vanpool

NC-2009 SSc4.4: Alternative transportation - parking capacity
posted by William Weaver on Mar 10, 2014, 5:13 pm

This feels like a question in semantics, but I'm going to throw it out there anyway. I'm working on a project for the Department of Transportation, and they are planning on providing signage for...

Last reply: William Weaver, Aug 27, 2014, 1:49 pm

3 floors + Attic: LEED Homes or LEED NC?

LEED Rating System Selection
posted by Mario S. on Apr 3, 2014, 9:50 am

Good day,

I have a residential development project outside the U.S which consists of several low-rise buildings of 3 stories + Attic (3rd floor hence consists of a duplex). The attic,...

Last reply: Mario S., Apr 9, 2014, 3:30 am

LEED V4 Reference Guide

General forums
posted by Erika Duran on Apr 4, 2014, 1:22 pm

Why are the credits no longer numbered? This for me is pretty irritating - anyone else have views or comments on this?

Last reply: Erika Duran, Jul 3, 2014, 9:32 am

Fresh air provided by transfer grill

NC-2009 IEQp1: Minimum indoor air quality performance
posted by Maya Karkour on May 23, 2014, 4:32 am

Dear all,

I am consulting on a big project which has small electrical rooms (~30 sq.ft) in the mechanically ventilated parking basement. The Engineers are claiming that it's not practical...

Last reply: Maya Karkour, Jun 6, 2014, 10:10 am

IDC Materials & Resource Calculator- Latest from USGBC??

CI-2009 MRc4: Recycled Content
posted by James Keohane on May 23, 2014, 4:59 pm

I need help identifying what the latest acceptable( to Reviewers) M&R Calculator is for CI. The latest I can find from USGBC Is "IDC Materials and Resources Calculator (June 2012)" . Is...

Last reply: RETIRED, May 14, 2015, 6:03 pm

Lack of PPM data plus suggestions for improvement

Pilot-Credits EApc66: Community contaminant prevention - airborne releases
posted by Jamison Hill on Jul 2, 2014, 6:05 pm

I can only find general pilot documentation requirements for this credit which includes registering for the credit, participating in the LEEDuser forum and completing the survey. Are there any other...

Last reply: Levi Jimenez, Feb 28, 2019, 7:41 pm

Fan Power Calculation

NC-2009 EAp2: Minimum Energy Performance
posted by Jatuwat Varodompun on Jul 12, 2014, 1:18 pm

Let's say we have a HVAC supply fan of a baseline which is calculated to be 3,000 cfm and the baseline fan power at 0.001 kW/cfm.This makes the fan power to be 3 kW. What if the same space has a...

Last reply: Jatuwat Varodompun, Jul 15, 2014, 9:32 am

Building Envelope Cx Checklist for LEED Documentation

NC-v4 EAc1: Enhanced Commissioning
posted by Joyce Kelly on Aug 7, 2014, 2:42 pm

I am currently developing a Building Envelope...

Last reply: Scott Bowman, Nov 10, 2016, 9:49 am

Modeling a humidifier in the baseline case

NC-2009 EAp2: Minimum Energy Performance
posted by Gustav Alfaro on Aug 11, 2014, 1:31 am

Hi, I am working on a data center project under NC 2009. For the proposed case we have self-contained steam electric humidifiers that are an accessory for the CRAH units; the question is if those...

Last reply: Marcus Sheffer, Aug 21, 2014, 4:48 pm

SRI value for concrete

NC-v4 SSc5: Heat Island Reduction
posted by LEED Pro Consultant on Aug 26, 2014, 2:01 pm

Hi,
In LEED v2009 BD+C Sustainable Sites Credit 7.1 there is a table with solar reflectance index for standard paving materials, where the typical new gray concrete is 35.
Are these...

Last reply: emily reese moody, May 16, 2021, 7:08 pm