Baseline Chillers

NC-2009 EAp2:Minimum Energy Performance
posted by  Santiago Sánchez Sánchez  on 

Greetings,

We are working on a large project which has 10 customized Chillers each chiller over 2,000 tons.

1
Fri Mar 13, 2020, 2:26 pm

Modeling Future Tenant Spaces

CS-2009 EAc1:Optimize Energy Performance
posted by  Anna Kaelin  on 

As our C&S spaces are a future build out we have to predict what the fan power in our FCUs will be. We have manufactures data for all the potential FCUs that could be connected to the

1
Fri Mar 20, 2020, 6:44 pm

Satisfaction of the authority

NC-v4 LTc3:High priority site
posted by  Florian Schmidtchen  on 

Dear all, can anyone explain "satisfaction of the authority"? Under German law the property owner is obligated to remediate all contaminations.

4
Senior Project Manager
Zinner Consultants
LEEDuser Basic Member
110 thumbs up
Thu Mar 12, 2020, 4:28 pm

"Dirt cheap Net Zero"--looking for co-presenters for August conference

Green Commons
posted by  Z Smith  on 

We are looking for colleagues from other firms to join a conference session proposal on "Dirt cheap Net Zero" for the ASHRAE / IBPSA conference (August 12-14, 2020, Chicago). 

0

Option 2 - Leadership Extraction Practices

CS-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Sara Johansson  on 

How can structure and shell only be allowed to contribute towards 30% of the compliant building material cost, when 25% is enough to fullfil this credit?

8
Thu Mar 12, 2020, 12:34 pm

Calculate illuminance intensity for sun (direct component) and sky (diffuse component) for clear-sky

CI-v4.1 EQc7:Daylight
posted by  Amal Venugopal  on 

Hi,

We are doing the day lighting simulation for office building under LEED ID+C v4.1 rating system. We have opted the option 2 simulation approach to meet the credit requirements.

1
Thu Mar 19, 2020, 7:36 am

Additional scope to test...what if there is no contamination found?

NC-v4 LTc3:High priority site
posted by  emily reese moody  on 

We have a project that is not required to do site contamination testing, and does not believe there is any reason for the site to have contamination (they have always owned the site), so they did n

6
Senior Project Manager
Zinner Consultants
LEEDuser Basic Member
110 thumbs up
Thu Mar 12, 2020, 6:17 am

UPLOAD button not available?

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Jenni Betancourt  on 

We are at the stage where we are responding to the GBCI Reviewer's comments on the Design/Construction Submittal.

7
Senior Project Manager
Zinner Consultants
LEEDuser Basic Member
110 thumbs up
Wed Mar 11, 2020, 11:19 pm

Outdoor Ice Rink Energy Performance

NC-v4 EAp2:Minimum energy performance
posted by  Ralph Bicknese  on 

We are looking at LEED for a multi-purpose sports facility with indoor space and an outdoor ice rink that is not enclosed.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Mar 11, 2020, 9:16 pm

Group or single project for Warehouse

NC-v4 MPR2:Must use reasonable LEED boundaries
posted by  Sofia Barahona  on 

We are currently working on a warehouse which has a total of 12,704.13m2, the project consist of a building of storage and operative offices with a total of 12,516.67m2 and a small separate spaces

1
Sun Mar 15, 2020, 12:53 pm