Forum quick links
Exemplary Performance for Optimized Energy - Schools
Schools-NC-v4 EAc2:Optimize energy performanceposted by Rebecca Holt on
Are Schools-NC-v4 projects eligible to earn Exemplary Performance for Optimized Energy Performance if 54% savings or more is demonstrated?
ANSI/BIFMA e3-2014 or e3-2012 Compliance Documentation
CI-v4 MRc5:Building product disclosure and optimization - material ingredientsposted by ESD Engineer on
I'm looking at the certificate provided by SCS Global that states that the product is "Level 3" and "conforms to ANSI/BIFMA e3-2014e".
BPF for ASHRAE 90.1 or LEED v4
NC-v4 EAp2:Minimum energy performanceposted by Waleed AlGhamdi on
We're working on a project where multiple versions of ASHRAE 90.1 are enforced. LEED v4 enforces 2010 and other government agencies enforce 2016 (also potentially 2013).
Heated Pool - Baseline Service Hot Water System
NC-v4 EAp2:Minimum energy performanceposted by Ricardo Sá on
Dear All,
Using BIOMASS Fuel to create steam, service production
NC-v4 EAc5:Renewable energy productionposted by Dang Thi on
We have a case for our project, the production need steam so they use boiler, but the fuel is biomass (sugarcane bagasse, rice husk, rice straw, coconut shell, peanut shell, agric
Understanding Carbon - Gap Analysis
posted by Kjell Anderson on
First, there was Energy Use reductions
Then there was embodied carbon
Soon it will be refrigerant use/leakage calculations
…and much more
Parking garage ventilation
NC-v4 EQp1:Minimum indoor air quality performanceposted by Lisa Loreti on
The Project Team needs some clarifications about parking garage ventilation. We have three different questions, not linked to each other.
Online Facilitation Workshop with Julie Huffaker from Deeper Funner Change!
posted by RoseAnn Grimes on
Facilitating Engagement and Collaboration in Virtual Meetings (or, Avoiding a Goat Rodeo with Many Awkward Silences*)
Zoning in Retail
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Jan Hesse on
I am working on an CI for Retail project. The Retail space will be included in an shopping mall and is three floors high.