Can I lock the credits not to be touched by other team members?LEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Matt Dem on May 22, 2015, 7:04 pm
Is there any feature in LEED online to lock the credits not to be changed by other team members ? I was about to submit for design final submission but then the owner postponed it for one... Last reply: Charles Nepps, May 24, 2015, 6:27 pm |
|
Filed (2)exemp. performance credit under (1) ID in case one failLEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Matt Dem on May 22, 2015, 2:14 pm
Hi, ID credit form shows the first exemplary credit but I... Last reply: Matt Dem, May 22, 2015, 2:52 pm |
|
Lead PaintSchools-2009 SSp2: Environmental Site Assessmentposted by Adam Musante on May 22, 2015, 9:12 am
Generally speaking, is the presence of lead paint in an existing school from the 1950's cause for concern and must be addressed or else the prerequisite is not satisfied? More specifically, if... Last reply: Adam Musante, May 22, 2015, 1:45 pm |
|
Shuttle ServiceCI-2009 SSc3.1: Alternative transportation - public transportation accessposted by Kalyan Nishtala on Mar 3, 2015, 2:03 pm
Hi, Last reply: Karin Miller, May 22, 2015, 11:46 am |
|
Where do I upload the response report for Design Final Package?NC-2009 EAp2: Minimum Energy Performanceposted by Matt Dem on May 21, 2015, 7:09 pmMarcus Sheffer LEED Fellow 7group / Energy Opportunities LEEDuser Expert 5867 thumbs up May 22, 2015- 9:34 am Answered in this forum- http://www.leeduser.com/topic/leed-reviews-leed-online-appeals-designcon... Log in or register to post comments ... Last reply: Marcus Sheffer, May 22, 2015, 9:34 am |
|
Can I defer any ID credit to submit it w/ construction package?NC-2009 EAp2: Minimum Energy Performanceposted by Matt Dem on May 21, 2015, 7:08 pmMarcus Sheffer LEED Fellow 7group / Energy Opportunities LEEDuser Expert 5867 thumbs up May 22, 2015- 9:33 am Answered in this forum- http://www.leeduser.com/topic/leed-reviews-leed-online-appeals-designcon... Log in or register to post comments ... Last reply: Marcus Sheffer, May 22, 2015, 9:33 am |
|
Can I defer any ID credit to submit it w/ construction package?LEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Matt Dem on May 22, 2015, 8:34 am
Hi, I previously filed an innovation credit with my design preliminary submission and received an comment from... Last reply: Matt Dem, May 22, 2015, 9:23 am |
|
Where do I upload the response report for Design Final Package?LEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Matt Dem on May 22, 2015, 8:35 am
We, as a team are getting ready to submit our design final submission and prepared a report to respond to each individual comments made by... Last reply: Matt Dem, May 22, 2015, 9:22 am |
|
Thermal Comfort SurveyNC-2009 IEQc7.2: Thermal comfort - verificationposted by Leed User on May 20, 2015, 2:48 am
I used the survey template provided on this site and was denied the credit saying it did not address all of the ASHRAE 55-2004 environmental variables (air speed, humidity, radiant temperature,... Last reply: William Weaver, May 21, 2015, 6:08 pm |
|
EAp2-4: Energy Star equipment: conversion from kWa to WattsCI-2009 EAp2: Minimum Energy Performanceposted by Sarah Simchuk on May 19, 2015, 6:01 pm
I'm attempting to register the energy star equipment for my project under Table EAp2-4. The table asks for... Last reply: Marcus Sheffer, May 20, 2015, 2:14 pm |