Log in
Forum » U.S. and Canada
Topic

Square Footage for the Decorative Lighting Allowance

CI-2009 EAc1.1: Optimize energy performance - lighting power
posted by Christopher Shaw on Aug 13, 2015, 6:14 pm

When you claim a lighting allowance for Decorative appearance you get 1 watt/sf. What I can't figure is what sq footage are they referring to: if the whole space it's in, the little decorative...

Last reply: Marcus Sheffer, Aug 13, 2015, 6:34 pm

Natatorium Locker Rooms

NC-2009 IEQp1: Minimum indoor air quality performance
posted by Carl Karlen on Aug 11, 2015, 4:16 pm

I am filing out the LEED documentation for IAQc1 for a Rec Center in St. Louis, MO. There is a Natatorium in this Rec with attached Locker/restroom/shower spaces. We are exhausting these space...

LEED GA v4 exam

General forums
posted by Monica Pinjani on Sep 22, 2014, 11:55 pm

Hi Everyone
I intent to take the Green GA exam this October. Was initially planning to take the 2009 format exam but due to personal reasons couldn't take it before June 15. Just needed...

Last reply: Paula Melton, Aug 10, 2015, 10:15 am

EnergyPro for Whole Building Energy Simulation

NC-2009 EAp2: Minimum Energy Performance
posted by Logan Dorrell on Aug 5, 2015, 6:05 pm

We have a project in which they are attempting to use EnergyPro to show compliance for credits EAp2 and EAc1. Has LEED been accepting of EnergyPro models for this credit, when it does not allow...

Last reply: Logan Dorrell, Aug 7, 2015, 11:42 am

How to document a non-LEED-certifiable building?

NC-2009 EAp2: Minimum Energy Performance
posted by Anya Fiechtl on Aug 3, 2015, 5:44 pm

Our project includes a separate non-LEED certifiable building with no regularly occupied space and no...

Last reply: Marcus Sheffer, Aug 7, 2015, 9:11 am

MRpc69 Attainable in Commercial Interior Project

Pilot-Credits MRpc69: Construction and demolition waste management
posted by Erica Suarino on Aug 6, 2015, 3:39 pm

This credit was easily attainable for an interior renovation in the New York metropolitan region. Haulers that divert and send waste to reclamation facilities for end use in a variety of...

Separate CxA's for Fundamental and Enhanced Cx?

NC-2009 EAc3: Enhanced Commissioning
posted by Timothy Casper on Oct 24, 2014, 9:17 am

In a traditional design-bid-build project, does the...

Last reply: Scott Bowman, Aug 6, 2015, 12:06 pm

Residential high rise with school at the base

NC-2009 MPR2: Must be a complete, permanent building or space
posted by Ilana Judah on Jul 22, 2015, 12:55 pm

We are designing a high-rise residential tower with a school and retail area at the base. There is some entry and service space serving the residential tower on the cellar and ground floor levels...

Last reply: Ilana Judah, Aug 5, 2015, 10:32 am

PC 81- Clarifications

Pilot-Credits IPpc81: Green training for contractors, trades, operators and service workers
posted by Patty Lloyd on Aug 4, 2015, 3:12 pm

Our project just completed the pilot credit for this on an interiors project. Will be interested to see the...

Document Upload

NC-v4 EQc6: Interior lighting
posted by Boggarm Setty on Aug 4, 2015, 10:40 am

For V4, is there no requirement anymore to upload supporting documents?
I don't see any upload buttons on the form itself.

Last reply: Charalampos Giannikopoulos, Aug 4, 2015, 10:43 am