1 year contract?

NC-2009 EAc6: Green Power
posted by Erin Holdenried on May 29, 2015, 2:10 pm

In v2.2 is was acceptable to have a 1 yr contract as long as the total...

Last reply: Marcus Sheffer, May 29, 2015, 2:34 pm

Compostable Trash Can Liners

EBOM-2009 IEQc3.3: Green cleaning - purchase of sustainable cleaning products and materials
posted by Kimberlee Dobbins on Jan 28, 2015, 10:15 am

Can anyone help me figure out under which Sustainable Criteria Compostable Trash Can Liners would fall under?

Last reply: Tracy Smith, May 28, 2015, 6:10 pm

IEQp1

NC-2009 IEQp1: Minimum indoor air quality performance
posted by Gordon Nielson on May 27, 2015, 4:04 pm

I am having troubles understanding what is a single zone system and a multiple-zone system and how to fill out the forms. Example: I have a zone with eight individual offices and corridor on a...

Last reply: Gustavo De las Heras Izquierdo, May 27, 2015, 4:14 pm

Campus Registration instead of Block?

LEED Guidance for Campuses and Multiple Buildings
posted by Deborah Lucking on May 27, 2015, 12:45 pm

Hello all.
I notice on LEED Online that there is now an option to register a new project under "Campus" but not under "Block", which USED to be the way to start the registration process for...

Last reply: Eric Anderson, May 27, 2015, 1:05 pm

Storm dry pond onsite overflows to stormceptor

LEED Canada Forum
posted by Marie-France Duthilleul on May 27, 2015, 10:49 am

Pre condition - open field and grass, a few trees.

Post Condition: Development of a large military type vechicle building with loading docks and paved circulation drive area. Runoff from...

90% controls for open office systems furniture

CI-2009 IEQc6.1: Controllability of systems - lighting
posted by Brian VanAllen on May 27, 2015, 10:45 am

As the electrical design engineer; what is an acceptable means for me to meet the 90% controllability requirement on my drawings- for open offices? Please keep in mind this is for an open space...

initial fit-out vs alteration?

Retail-CI-v2009 PIf2: Project Summary Details
posted by Andrew Bennett on May 26, 2015, 3:51 pm

What is the difference between initial fit-out and alteration square footages? We have an existing building in which we are not touching the exterior walls, but are renovating the interior,...

Exterior Lighting Baseline vs Proposed

NC-2009 EAp2: Minimum Energy Performance
posted by Maria Unruh on May 26, 2015, 3:35 pm

I'm trying to understand baseline exterior lighting versus the proposed. My calculations show that my proposed is less than my baseline, is this okay? What is USGBC looking for when they ask for...

Last reply: Marcus Sheffer, May 26, 2015, 3:42 pm

LEED for Neighborhood Development + Walkable Project Site

Pilot-Credits PC14: Walkable Streets
posted by Nikki Wildman on May 26, 2015, 12:18 pm

We just wanted to share a little of our experience with this credit. We were not originally intending to pursue any pilot credits for this project, but realized that we were located in a LEED for...

Does an indoor sewage pit need exahust for EQc5?

CS-2009 IEQc5: Indoor Chemical and Pollutant Source Control
posted by Kristopher Lashley on May 25, 2015, 7:29 pm

We have a project where there is a sewage pit located on floor P2 of the parking garage. It's in a separate enclosed room and the question is whether or not it needs to be exhausted and included...

Last reply: Michelle Halle Stern, May 26, 2015, 9:34 am