Pre condition - open field and grass, a few trees.

Post Condition: Development of a large military type vechicle building with loading docks and paved circulation drive area. Runoff from the site goes to two large grassed dry retention ponds with overflow to a Stormceptor system and than discharges off site.

Looking to prove SS LEEDS Credit 6.1 (SWM - Quantity) and 6.2 (SWM Quality Control)