Forum discussion

Storm dry pond onsite overflows to stormceptor

Pre condition - open field and grass, a few trees. Post Condition: Development of a large military type vechicle building with loading docks and paved circulation drive area. Runoff from the site goes to two large grassed dry retention ponds with overflow to a Stormceptor system and than discharges off site. Looking to prove SS LEEDS Credit 6.1 (SWM - Quantity) and 6.2 (SWM Quality Control)

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.