Topic | Recent |
---|---|
Certification agency meeting the ISO GuidelinesPilot-Credits MRpc87: Verified Construction & Demolition Recycling Ratesposted by Stephanie Graham on Mar 21, 2016, 11:21 am
Under the requirements of qualifying certification agencies, it reads, "The certification organization follows guidelines for environmental claims and third-party oversight, including ISO/IEC... |
|
video conferencing equipmentCI-2009 EAp2: Minimum Energy Performanceposted by Kristen Magnuson on Mar 18, 2016, 4:05 pm
Our project has several pieces of video conferencing equipment (not just display screens), which are not ENERGY STAR certified. As far as we can tell, there is no relevant ENERGY STAR category... Last reply: Marcus Sheffer, Mar 20, 2016, 7:56 pm |
|
Who can be the CxA?CI-v4 EAc1: Enhanced Commissioningposted by emily reese moody on Feb 26, 2016, 9:39 pm
Under v3, if a project wanted to pursue the enhanced... Last reply: Scott Bowman, Mar 18, 2016, 8:06 pm |
|
Reduced Mercury ContentCI-2009 IDc1: Innovation in Designposted by Lou Niles II on Feb 4, 2016, 12:30 pm
Hello, We have multiple projects in LEED v2009 for which we could earn this ID Credit and point for but the process of documentation seems quite ridiculous using the... Last reply: Helen Kessler, Mar 18, 2016, 7:54 pm |
|
Transients for complex occupancyNC-2009 PIf3: Occupant and Usage Dataposted by David Browne on Feb 17, 2016, 4:30 pm
In trying to determine the peak transients and daily average transients for a building with several distinct user groups, my client has given me a schedule of when each group will use the... Last reply: Summer Minchew, Mar 18, 2016, 11:12 am |
|
SS 7.2 (v2009 C+S)-- Tenant Improvements to RoofCS-2009 SSc7.2: Heat island effect - roofposted by Justin Oldfield on Mar 10, 2016, 2:24 pm
Our core and shell project has chosen a roofing material compliant with SS 7.2. However, there may be future tenant improvements to the roof to add pavers/tiles, decking, plants, or other... Last reply: Summer Minchew, Mar 18, 2016, 10:46 am |
|
Responses to preliminary review commentsNC-2009 EAp2: Minimum Energy Performanceposted by David Browne on Mar 15, 2016, 12:42 pm
My engineers' submittal for this prerequisite resulted in a lengthy list of comments, with a requirement that a narrative response to each comment be provided. However, there doesn't seem to be a... Last reply: David Browne, Mar 17, 2016, 10:48 am |
|
ASHRAE 62.1NC-2009 IEQp1: Minimum indoor air quality performanceposted by Kristopher Lashley on Mar 16, 2016, 1:42 pm
We have an electrical room on site that is not attached to the main building and will hold the electrical equipment for a diesel fueling station. Someone will be in the room twice a day just to... Last reply: Dave Hubka, Mar 16, 2016, 1:56 pm |
|
LEED Project Boundary, Concerned about Future Buildings...NC-2009 PIf2: Project Summary Detailsposted by Rachel Manoguerra on Feb 22, 2016, 5:39 pm
I registered a utility training center as an individual project on LEED Online, because at the time that was our understanding. Now we have almost completed design and there are at least two... Last reply: Jon Clifford, Mar 15, 2016, 11:23 pm |
|
High Process Load and Equipment EfficiencyCS-2009 EAp2: Minimum Energy Performanceposted by Shad Traylor on Mar 14, 2016, 11:28 am
Our project is a manufacturing plant which is seeking certification under NC Core and Shell v2009. The building will have a high process load (could be 50%) but the equipment has not yet been... Last reply: Marcus Sheffer, Mar 15, 2016, 8:59 pm |