Log in
Forum
Topic

Is Pilot Credit SSpc55 still available for LEED v4 projects?

Pilot-Credits SSpc55: Bird collision deterrence
posted by Lawrence Rennell on Sep 22, 2022, 5:23 pm

I am not able to locate the registration page for this credit on USGBC.ORG. (Page not found)

Last reply: emily reese moody, Sep 22, 2022, 6:58 pm

Urinals, All gender restrooms, and percentage calculations

NC-v4 WEp2: Indoor water use reduction
posted by Kristian Kicinski on Aug 2, 2021, 8:59 pm

We are working on design for a high school taking an all-gender approach to toileting. Each all-gender restroom has 10 private stalls with communal lavatories. The project is considering making...

Last reply: Kristian Kicinski, Sep 22, 2022, 3:46 pm

DES modeling Path 2 or Path 3 under Campus Approach

NC-v4 EAp2: Minimum Energy Performance
posted by Anna Korinkova on Sep 22, 2022, 9:51 am

Hello everyone, 

we are setting energy modeling strategy for a major industrial plant with an on-site...

Last reply: Anna Korinkova, Sep 22, 2022, 2:17 pm

Number of Parking Spaces for EVSE in v4

Schools-NC-v4 LTc8: Green vehicles
posted by Steven Wychorski on Oct 13, 2016, 2:08 pm

For v4 Schools, the BD+C Reference guide gives the formula for Alternative Fuel Fueling Stations calculation at 2%. But the LTc8 Online form says Parking spaces for EVSE must be at least 3% of...

Last reply: Priscillia Champagne, Sep 22, 2022, 1:20 pm

Safety First & WELL Health + Safety Crossover

Pilot-Credits INpc155: Safety First: Design for Indoor Air Quality and Infection Control
posted by Patti MacKenzie on Dec 20, 2021, 2:22 pm

We are attempting INpc155 on a v4.1 CI project, we are also planning to obtain the WELL H+S rating so this credit was an easy crossover for us. So glad to see this connection happening between...

Last reply: Paula martinez campos, Sep 22, 2022, 10:25 am

When to submit this credit, DR or CR? Documentation of distribution of menstrual hygiene products

Pilot-Credits WEpc147: All-Gender Restrooms
posted by Linn Stolt on May 30, 2022, 10:38 am

Hi!

I am wondering when you should submit the documentation for this credit, during desgin review or during construction review? Where can you see this information? I have the same...

Last reply: Zeynep Cakir, Sep 22, 2022, 7:16 am

Example or requirements for compliant "Site Assessment".

EBOM-v4.1 SSc4: Site management
posted by julie baines on Sep 21, 2022, 7:53 pm

The credit language says, "Conduct a...

Green area reserved for future building development

NC-v4.1 SSc2: Protect or Restore Habitat
posted by Michael on Aug 29, 2022, 1:50 pm

My project has 2 phases of development. Currently, we only apply LEED for phase 1. There is a big greenery area, reserved for future building in phase 2. Can we count this greenery area as a...

Last reply: Kimiko Marinacci, Sep 21, 2022, 2:52 pm

Inpatient floors

Healthcare-v4.1 EQc7: Daylight
posted by Jennifer Atherton on Sep 21, 2022, 12:03 pm

Are inpatient floors excluded from the daylight calculations?  Or is the perimeter area to be determined for inpatient floors as well as non-...

Baseline System for District Energy System (DES) Option 2

NC-v4 EAc2: Optimize Energy Performance
posted by Keith Lane on Sep 21, 2022, 9:56 am

I'm working on a 73,000 s.f. clasroom building that has air-cooled chiller and boiler plants connected to a seperate building so need to follow the...

Last reply: Keith Lane, Sep 21, 2022, 10:37 am