Topic | Recent |
---|---|
Are Materials Installed in the Loading Bay Subject to the Low-Emitting Material Requirements?NC-v4.1 EQc2: Low-emitting materialsposted by Kristina K on Jan 7, 2025, 4:51 pm
Hello, Are materials used in loading bays required to be submitted under the low-emitting materials credit? For our project, the loading bay is accessed through a garage door and is... Last reply: Ralph Bicknese, Jan 8, 2025, 12:34 pm |
|
Exterior Tradable Surfaces Allowed LPD in MEPC.CS-2009 EAp2: Minimum Energy Performanceposted by Paula Hernandez on Jan 8, 2025, 7:50 am
Hello, I am performing an energy modelling for a C&S building. |
|
Regd. Fresh Air Qty for energy modellingNC-v4 EAp2: Minimum Energy Performanceposted by Anurag Ghosh on Jan 8, 2025, 3:41 am
Hi, We are performing energy modelling for an airport. We have the Heat Load Summary Sheet where the Minimum Outdoor Air Requirement is taken with 30% excess to ASHRAE 62.1... |
|
Guidance on Green Wall Irrigation RequirementsData-Centers-NC-v4 WEc1: Outdoor water use reductionposted by Venkatkrishnan Ashok on Dec 10, 2024, 11:58 am
Hello, We are proposing a green wall for our project, which will require irrigation and must adhere to the guidelines outlined in Option 2 of this credit. However, we were unable to locate... Last reply: Quantity Takeoff, Jan 7, 2025, 12:43 am |
|
chilled water and hot water metering for expansions of an existing buildingNC-v4 EAc3: Advanced Energy Meteringposted by Moses Chong on Dec 11, 2024, 2:40 pm
I'm working on a project that is an expansion of an existing building, primarily adding a few levels on top. The cooling and heating energy of the expansion exceeds 10% of total energy use so... Last reply: Texas Takeoff, Jan 7, 2025, 12:41 am |
|
Adhesive & Sealants: VOC Content 0 g/L VOC Emissions?NC-v4.1 EQc2: Low-emitting materialsposted by Alyssa Scharf on Oct 3, 2024, 10:08 am
There is an adhesive that the manufacturer claims is 0 g/L of... Last reply: Juni pereva, Jan 7, 2025, 12:40 am |
|
Baseline and Proposed Constructions for a building constructed in 1970 for ID+C ProjectNC-v4 EAp2: Minimum Energy Performanceposted by Rajat Wadhwa on Oct 8, 2024, 12:03 pm
Hi, I am working on a LEED ID+C V4project , we dont have existing construction details for the building and the building was constructed in 1970, What should i assume for building... Last reply: Juni pererva, Jan 7, 2025, 12:35 am |
|
Qualifying compliance to Extreme Heat design parametersPilot-Credits IPpc99: Design for Enhanced Resilienceposted by Jolene McLaughlin on Mar 25, 2020, 5:50 pm
Does anyone have a view of what would qualify to meet some of the subjective requirements in the Extreme Heat design measures? Statements like "High levels of insulation" and "lower Solar Heat... Last reply: Kelli Kimura, Jan 6, 2025, 8:42 pm |
|
Option 1: Climate Related Risk Management Planning StepPilot-Credits IPpc98: Assessment and planning for resilienceposted by Marina Rullo on Oct 27, 2023, 1:04 pm
Our firm pursued this credit for a project site in Baltimore, MD. I found that the prerequisite and Option 1 overlap a great deal, especially when they are presented in the same worksheet. In the... Last reply: Kelli Kimura, Jan 6, 2025, 7:52 pm |
|
Water uses not covered by indoor water use reduction (cleaning and cooking)Pilot-Credits WEpc115: Whole Project Water Use Reductionposted by Dionisio Franca on Dec 24, 2019, 12:25 am
We have some uses that are not included in the indoor water use reduction, such as water for cleaning and cooking. Did anyone try to include those usages in the calculation? Should they be... Last reply: Rebecca Rice, Jan 6, 2025, 4:04 pm |