Forum quick links
Core & Shell M&V
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Randy Cook on
Hello, I have read thru the previous posts and responses, and hope this is not a redundant question. I am working on a C&S major renovation. We are going to follow Option B from IPMVP Vol.3.
Design or Construction Credit?
Pilot-Credits EQpc24:Acousticsposted by Orlin Velinov, PE on
Is this s design or construction credit? From the credit form requirements looks like the NC levels will have to be measured, the rest criteria can be theoretically analysed or modeled.
Parking Capacity overflow to Gravel Lot
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Eduardo Guzman on
We have a research building that shares an asphalt parking lot with a warehouse (used by the researchers but not being certified).
Specifications for GC regarding MR Credits
NC-2009 MRc2:Construction Waste Managementposted by Jim Pugh on
We are about to start our 2nd LEED project and are interested in providing wording within the Specifications for the General Contractors bidding the project preparing them for the required paperwor
Speech privacy
Pilot-Credits EQpc24:Acousticsposted by James Chueh on
Hi all, We have a clinic project that is seeking LEED HC certification and the credit IEQ c2 is similar to this pilot credit.
Filter Performance
EBOM-2009 IEQc1.4:IAQ Best Management Practices—Reduce Particulates in Air Distributionposted by Alexa Stone on
Has anyone ever had an issue with MERV 13 filters not maintaining original quality and performance levels? Also, I cant find if this credit requires active monitoring of any sort that would capture
LEED-HC MRc4.2 - Wire & Cable Lead Content <300ppm
posted by Simon Sue on
In regards to the following statement, as part of the MRc4.2 requirements: "Specify and use electrical wire and cable with lead content
LEED HC IEQp1
posted by Emil Andersson on
Hi. I am looking into certifying a Healthcare facility in Sweden with LEED for Healthcare.
Cove lighting as decorative?
NC-2009 EAp2:Minimum Energy Performanceposted by Orlin Velinov, PE on
Has anybody used the ASHRAE 9.6.2 Additional Interior Lighting Power allowance for cove lighting.