Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Is there a time limit to submit for final final review

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Steve Khouw  on 

We have a project already passed the Design Phase review almost one year ago then the project was suspended during construction by the Owner for their internal reasons and recently restarted again

3
Wed Apr 18, 2012, 5:16 pm

Self-Declared compliance

Schools-2009 IEQc4.6:Low-Emitting Materials—Ceiling and Wall Systems
posted by  Alison Y Rivenburgh  on 

Has anyone had any luck submitting materials that are "self-declared" compliant from the manufacturer?

3
Wed Apr 18, 2012, 4:09 pm

Zone air distribution ventilation effectiveness

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Maria Kutelova  on 

I need help with determining proper case for the Air Distribution Configuration per table per Table 6-2. The forth entry required a velocity of 150 cfm to be reached within 4.5 ft of floor levels.

2
Principal, Energy and Engineering Leader
DLR Group | Westlake Reed Leskosky
LEEDuser Expert
267 thumbs up
Wed Apr 18, 2012, 1:40 pm

AGMBC for a Campus Wide Study

LEED Guidance for Campuses and Multiple Buildings
posted by  Mei Zhu  on 

We are doing a study on a university campus which has had a few LEED certified projects in the past.

2
LEED Project Reviewer certificate holder
LEEDuser Basic Member
76 thumbs up
Tue Apr 17, 2012, 7:19 pm

Option 1 Path 2

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  shaun Andriano  on 

Hello. We have a building looking to meet the requirements for Option 1 Path 2. In the credit language it states that the flush is to stop at the end of occupancy for that day.

9
Tue Apr 17, 2012, 4:41 pm

Documenting VOC content in products

CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Petra Hajná  on 

Hi everybody... again. Does anybody know if manufacturers' letters are accepted as proper documents to proof VOC levels?

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Apr 17, 2012, 4:32 pm

Unable to receive the Energy Star Rating

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  Dorilee Torres  on 

Hello, I am involved in a Medical Device facility that is pursuing LEED evaluation. It was built and operates since three years ago outside the US.

3
Tue Apr 17, 2012, 3:59 pm

EAp2/EAc1 Renovation Vs. New construction

NC-2009 EAp2:Minimum Energy Performance
posted by  Steven Beccia  on 

We are modeling a classroom building. The building is 55% renovated, and 45% new construction. We are renovating the major HVAC systems, exterior envelope, and building interior.

3
Default Avatar
Mechanical Engineer
Clark Nexsen
LEEDuser Basic Member
4 thumbs up
Tue Apr 17, 2012, 1:28 pm

validity of a LEED 2009 registration

General forums
posted by  Melissa Merryweather  on 

I've been working for the past year on a suite of 3 NC projects for a client, all to be registered with LEED 2009 in the next month or so, and I've just been asked if there will be a limit to the v

5
Founder & CEO, LEED Fellow, BREEAM Fellow
BuildingWise LLC
LEEDuser Expert
224 thumbs up
Tue Apr 17, 2012, 3:36 am

Development density - just touches a building

NC-2009 SSc2:Development Density and Community Connectivity
posted by  Lawrence Lile  on 

My development density radius just touches a 92,000 square foot hotel, which will kick me over the 60,000 sq ft per acre limit.

4
LEED Project Reviewer certificate holder
LEEDuser Basic Member
76 thumbs up
Mon Apr 16, 2012, 6:59 pm