Topic | Recent |
---|---|
construction managementNC-2009 MRc5: Regional Materialsposted by Zu-Ning Chang on Mar 13, 2017, 9:01 am
Hello, I am curious about that how do LEED determine the regional distance of material is 500 miles? Thank you in advance for the answer. Last reply: RETIRED, Mar 28, 2017, 10:36 am |
|
Heat Island reduction provided by the building itsselfNC-v4 SSc5: Heat Island Reductionposted by Carmen Mielecke on Apr 19, 2017, 8:09 am
Dear All, if a Project consists of many small courtyyards and shade for those courtyyards is provided by the building... Last reply: Lyle Axelarris, Jul 20, 2021, 4:32 pm |
|
Overlap between LEED v4 and WELLWELL v1 Building Standard Tip Sheetposted by Nirwair Singh Bajwa on May 10, 2017, 5:28 pm
Hi, I am working on a WELL project which has registered for LEED v4 ID+C. Is there a document or study which can summarize overlap between LEED and WELL and points that can be earned... Last reply: Nirwair Singh Bajwa, May 12, 2017, 1:38 pm |
|
Changing rooms in adjacent LEED buildingNC-2009 SSc4.2: Alternative transportation - bicycle storage and changing roomsposted by Instra Ingenieros on Jun 30, 2017, 4:57 am
We have a project with an existing LEED adjacent building to the new LEED building. Both buildings are conected by the interior and the exterior and owned by the same landlord. The... Last reply: Sophie Kerr, Apr 30, 2018, 12:25 pm |
|
District Energy for Partial Building LoadNC-v4 EAp2: Minimum Energy Performanceposted by Jess Scanlon on Jul 6, 2017, 2:07 pm
I am modeling a new building on a university campus following LEEDv4 Option 1, Whole Building Energy Simulation. Last reply: Tyler Thumma, Apr 5, 2024, 11:43 am |
|
Subway- same as light rail?NC-v4 LTc5: Access to quality transitposted by Maria Porter on Aug 21, 2017, 7:23 am
Hi! Last reply: Calie Gihl, Jan 22, 2018, 2:18 pm |
|
LEED for Homes: Midrise Floor Storey limitMid-Rise-v4 MPR3: Must comply with project size requirementsposted by Tim Nabholz on Oct 31, 2017, 11:52 am
I have a project that is looking at pursuing a LEED certification. The project is a 23 storey residential facility and was wondering if LEED for Homes: Midrise could be pursued. I had mentioned... Last reply: Sherman Aronson, Sep 27, 2018, 2:27 pm |
|
System 1/2- Ventilation Fans / Heat RecoveryNC-v4 EAp2: Minimum Energy Performanceposted by Ricardo Sá on Nov 28, 2017, 4:46 am
Hi, we are modeling the HVAC system for the baseline building of a residential building. Since heating type in the proposed design will be electric, system 2 applies (1 PTHP shall... Last reply: Eduardo Vidal Kume, Oct 12, 2021, 10:15 am |
|
REACH complianceNC-v4 MRc4: Building product disclosure and optimization - material ingredientsposted by Charline SEYTIER on Dec 21, 2017, 7:01 amreferenced by Charline is not sufficient at only 1,000 ppm. Please search the LEEDuser forum for more on this. I think this question may have been a duplicate which was answered previously. Log in or register... Last reply: Ian McCall, Jul 7, 2024, 1:24 pm |
|
Average Weekend TripsNC-v4 LTc5: Access to quality transitposted by Brendan Isard on Jan 12, 2018, 9:32 am
We have a project which a bus line provides (15) trips on a Saturday and (11) trips on a Sunday, with an average of (13) trips between the (2) days. The credit language states that an average... Last reply: Kristina Bach, Jan 19, 2018, 12:01 pm |