Waterbody
ND-v2009 SLLp3:Wetland and water body conservationposted by Dina Ammar on
Is a marina considered as a water body? If not, will a new development still need to abide by the 100 feet buffer zone distance?
Default values
CI-2009 MRc4:Recycled Contentposted by Adrienn Gelesz on
In LEED NC there is an option to use default 25% recycled content for steel. Is this not applicabel to CI?
Assemblies Calculator
CI-2009 MRc4:Recycled Contentposted by Eric Thompson on
I see that LeedUser has an assemblies calculator for MRc5, but there doesn't appear to be one for c4 - is that correct?
Applicable version of water use reduction additional guidance
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Tiffany Moore on
I've seen several versions of this question posted, none of which appears to have been answered, so I'll ask it again. What version of the water use redcuction additional guidance should be appli
CS shopping mall - FTE
CS-2009 IEQc6:Controllability of Systems—Thermal Comfortposted by Adam Targowski on
I'm working on a core and shell shopping mall project and tenants will be responsable for HVAC equipment and thermostates installation in their spaces.
Sliding Door Adhesive
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Tes . on
Do adhesives used in the assembly of an exterior sliding door FRAME need to comply with the onsite VOC requirements?
semi-heated spaces
NC-2009 EAp2:Minimum Energy Performanceposted by PAWAN DAHIWAL on
What will be the effect on energy consumption if i model conditioned (warehouse) space as semi-heated space by using system type#9 or #10 in baseline. my dominant baseline system type is #5 (VAV)
Onsite Renewable Energy and RECs
NC-2009 EAc2:On-Site Renewable Energyposted by Todd Bundren on
My client has installed a large solar array on top of the parking garage. The output is 160kWh annually.
Project information forms
posted by Ameet AA on
If the project is registered according to AGMBC 2010, (Block - Mastersite -Building 1 and Building 2,3 approach) Do we have to submit the following project information form for Mastersite as well
System #7 for undesigned space
NC-2009 EAp2:Minimum Energy Performanceposted by Erika Duran on
I am working on a residential building, with more than 20,000 SF of conditioned non residential spaces, so I am using System #7 for non residential spaces.