Smoking Room Testing
CS-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Anna Korinkova on
Dear Leedusers, our project will include one smoking room within a restaurant space.
mixed use building- NC or CS?
posted by Courtney Royal on
Hello! The project has two large buildings which have an intertwined 3rd floor. Building A has retail space on floors 1st & 2nd and then residential on 4th-17th floors.
Active Sample Form not calculating Annual Water Consumption
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Kasandra Martin on
I am using the active sample form to calculate my usage. Seems basic, 13 FTE and 48 transients. I am making different usage groups.
System fan power - Baseline
NC-2009 EAp2:Minimum Energy Performanceposted by Luana Bertoletti on
Hi, I have a doubt related to the system fan power calculation described in section G.1.2.9.
LEED AP working from an other city
Retail-CI-v2009 IDc2:LEED Accredited Professionalposted by Tejaswi Damaraju on
Is it alright if the LEEP AP is associated with the project from another city..?
Type of receipt
NC-2009 MRc7:Certified Woodposted by Marcio Alberto Casado Pereira on
Don't know if the same happens in the US but in Brazil we have different types of receipt: the receipt of sale - issued by the vendor; receipt of transportation - issued by the carrier; receipt of
What information needs to be on the receipts?
CS-2009 MRc2:Construction Waste Managementposted by Gabriela Hernández Castillo on
Sometimes local enterprises in Central America are not that efficient regarding keeping track of their activities and the documentation that need to be submitted lacks of information.
EAc2.1 work
EBOM-2009 EAc2.3:Existing Building Commissioning—Ongoing Commissioningposted by Elizabeth Crenshaw Hammitt on
From reading these comments, it seems like any work done EAc2.1 MAY NOT count toward this credit.
Green energy default values
CI-2009 EAc4:Green Powerposted by Adam Targowski on
In our project we are not making an energy simulation so in this credit we are forced to use option 2. I have two concerns: 1.
What do I do with a roof tha is superimposed by an helipad?
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Marina Andrade on
In a discussion here in the LEED user, i read about roof's that are covered with usable spaces, and one of these areas cited, was the helipads, i'd like to know if even a helipad has to be subtract