EPD Stud- Separate products count towards 20+ goal under 1 EPD

NC-v4 MRc2: Building product disclosure and optimization - environmental product declarations
posted by Allison Para on Dec 29, 2023, 9:56 am

Hello LEED Pros,

I have a letter and an EPD from a manufacturer, and I want to confirm the letters validity regarding how each seperate product counts as 1 product point under the EPD,...

Last reply: Allison Para, Jan 2, 2024, 1:38 pm

Credit For Excess Chilled Water Rejected To Plant Site Chilled Water System

NC-v4 EAp2: Minimum Energy Performance
posted by Michael Hill on Feb 14, 2024, 4:53 pm

I am working on a project that is using heat pump chillers to generate hot and cold water for the building systems. When the building loads are cooling dominated, the excess heat is rejected to...

Last reply: Abdullah Tahir, Mar 26, 2024, 4:29 am

Group Approach?

LEED Rating System Selection
posted by Santiago Avila on May 27, 2024, 10:42 am

Hello everyone,

I am currently working on a project consisting of two residential towers (deep retrofit). Although they appear to be connected from the outside, the only connection...

Last reply: Glen Boldt, May 29, 2024, 11:51 pm

Copy/Printing Room- Client against adding a door

CI-v4 EQc1: Enhanced indoor air quality strategies
posted by Edgar Arevalo on May 29, 2024, 12:03 pm

I am working on a CI project where the client is against putting a self-closing door (or any door for that matter) to the copy/printing room inside the project space.  Typically, I have ran into...

Last reply: emily reese moody, Jun 5, 2024, 7:56 pm

Ecology Unit in Mechanical Design

NC-v4.1 EAp2: Minimum Energy Performance
posted by Mu'ath Ad on Jul 4, 2024, 9:22 am

5903 thumbs up July 5, 2024- 10:30 am Your question is not appropriate for this particular forum. From an energy perspective such an air cleaning device would be considered a process load and simply...

Last reply: Marcus Sheffer, Jul 5, 2024, 11:24 am

Last chance to comment on LEED v5

LEED v5 BD+C/ID+C: Energy and Atmosphere 2nd Public Comment
posted by Nadav Malin on Sep 27, 2024, 9:57 am

Weigh in on the second public comment draft of LEED v5 here. You can reply to this thread or use the "Post a Question/Comment" button to start a new thread.

The...

Last reply: Lenka Matějíčková, Oct 31, 2024, 12:37 pm

How to Model Proposed and Baseline HVAC system for a District level heating and Cooling system

NC-v4 EAp2: Minimum Energy Performance
posted by Rajat Wadhwa on Apr 11, 2024, 12:16 pm

Hi, 

I am working on a College Building where Cooling and Heating is done by Hot water and chilled water supplied to the building, Based on the user guide what I see is I need to model a...

Last reply: Manuel Romera Molina, Nov 11, 2024, 2:53 am

Baseline Fan Power Calculation (kW/CFM)

NC-2009 EAp2: Minimum Energy Performance
posted by Nina N on Jan 15, 2010, 7:32 am

to post comments Jean Marais b.i.g. Bechtold DesignBuilder Expert LEEDuser Basic Member 832 thumbs up January 25, 2010- 11:17 am Thank you for the explanation. Pitty there's no ASHRAE forum as good...

Last reply: Marcus Sheffer, Apr 9, 2018, 11:34 am

Dormitory that is No Smoking

NC-2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
posted by April Ambrose on Jan 26, 2010, 6:02 pm

I have a NCv2009 project that is a dormitory on a college campus.

This is a case where the reference guide and LEED Online do not seem to match. We have a dormitory project that is not...

Last reply: Tristan Roberts, Mar 11, 2011, 8:58 am

Team roles and responsibilities

NC-2009 EAc3: Enhanced Commissioning
posted by Kath Williams on Feb 11, 2010, 4:27 pm

House of Representatives LEEDuser Expert 11477 thumbs up February 17, 2011- 2:57 pm Not your fault... we just inverted the forum last week so that new comments are first. Thanks for participating. Log...