
Forum quick links
Interpolation of bimonthly water bills for monthly summaries
EBOM-2009 WEc1:Water Performance Measurementposted by Ryan Nelson on
Similar to how extrapolation of data for a submeter that was recently installed is appropriate, can I interpolate between bimonthly water bills in order to produce the monthly consumption summary?
Precertification and site/building area change
posted by Sandro Tubertini on
Is it there any problem to have a building precertified even so the site and building might be changed for design-construction regular certification? It is very important to have a direction on th
swimming pools - baseline
NC-2009 EAc1:Optimize Energy Performanceposted by Sonia Martini on
Hi The building I'm coping with includes some swimming pools. In the proposed case I've modeled them so that they conform to the project. How should I model them in the baseline case?
Lighting Power Density Calculation
NC-2009 EAc1:Optimize Energy Performanceposted by J Douglas Dietrich on
Should under-cabinet, individually-controlled, task lights be included as part of the ASHRAE building area method lighting power density calculation?
Part of Factory is designed but won't be installed now
NC-2009 EAp2:Minimum Energy Performanceposted by Valentin Grimaud on
Dear community, I am wondering how I should read the language of the 90.1 in the following case: - My project includes lots of process and related HVAC, which have been designed to 90% completion
VRF efficiency requirements
NC-2009 EAp2:Minimum Energy Performanceposted by Rudolph Carneiro on
Hello; Question; Are VRF sistems exempt from the efficiency requirements of 90.1-2007? Section 6.4.1.3 states that equipment not listed can be used. If they are exempt, why?
Individual Offices
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by AMY VAN DAM on
Any further insight on individual offices (one occupant)?
Activity/tracking log documentation
EBOM-2009 SSc2:Building Exterior and Hardscape Management Planposted by John Mascarenhas on
If the goal is 100% implementation of the Plan, does USGBC still require activity/tracking log and other evidence to be documented and submitted?
LEED Interpretation: get recycled content figures by plant
NC-2009 MRc4:Recycled Contentposted by Tristan Roberts on
LEED Interpretation #10246, out on 10/1/12, makes a pretty big change to documentation requirements for MRc4 (effective for pro