Forum quick links
Certifying one LEED building on a campus
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Lisa Sawin on
We have currently drawn our LEED boundary to include all areas that our building/scope of work is impacting.
Data Centers - Efficiency for UPS and computer servers for the
NC-2009 EAp2:Minimum Energy Performanceposted by Carlos Garcia on
Dear all We're working in the energetic simulation for the credit EA p 2 in LEED NC 2009 in a Data Center building.
Natural Ventilation: Which spaces are to be considered?
NC-2009 IEQp1:Minimum IAQ Performanceposted by Marco Abdallah on
1. Are only regularly occupied spaces to be considered or all generally spaces (including stairs, corridors, storage and technical rooms)? 2.
Thermal Comfort (IEQc 7.1) for Industrial Applications
NC-2009 IEQc7.1:Thermal Comfort—Designposted by Ismaiel Salama on
We are targeting this credit for a project with more than 70% of the buildings are utilised for industrial, processing, storage and manufacturing activities.
LEED v2.2 design credit re-evaluation during construction submit
posted by Susan Walter on
We are wrapping up a LEED v2.2. project and looking to submit for our construction review. The design credits have been through the process and the design review has been accepted.
Understanding how hazardous materials effect calculations
NC-2009 MRc2:Construction Waste Managementposted by Renee Shirey on
Scenario: select asbestos-containing material (ACM) to be left in exist. bldg (and is allowed to be) and will be handled during demolition.
No tenants at this stage
posted by R Jones on
What happens if the developer doesn't have any tenants onboard at the time of certification? Can a draft lease agreement suffice?
Form Template Compliance
NC-2009 MRp1:Storage and Collection of Recyclablesposted by Erin Cowan on
We are working with a University that collects everything but Glass however that is detailed out in the special circumstances.
Option 3, share whole bldg energy and water data
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Courtney Royal on
Hello! This may be a stupid question, but I am reviewing the requirements for EAc5.1 and came across Option 3.