Forum discussion

Thermal bridges in the model

3

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Mon, 08/09/2010 - 21:24

Specific and scattered thermal bridges are very difficult to model in a commercial building. Broad and general thermal bridges, like steel studs, should be modeled. Determining the envelope U values in 90.1 should follow Appendix A. Quite often LEED projects report the U value directly through the insulation and do not de-rate these envelope components properly.

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.