CS-2009 IEQp1:Minimum IAQ Performanceposted by Jean-Baptiste Noel on
Part of our warehouse project consists of a space (100m*100m*40m) using a ASRS (automated storage and retrieval system). It allows to store goods without people occupying the space.
Natural vs. Mechanical Ventilation for Warehouse
NC-2009 IEQp1:Minimum IAQ Performanceposted by Jean-Baptiste Noel on
We are currently working on a warehouse project, where each level is 'naturally ventilated' according to the local code (in Singapore); there are more than 5% openings, but the floor plate is very
Energy Star HVAC equipment
CI-2009 IDc1:Innovation in Designposted by Kasandra Martin on
Is having energy star rated equipment enough for an ID credit? I wondered if it is in the LEED NC, my current project will be going for LEED CI.
Horse and Buggy Parking
Schools-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Robert Fiala on
The school we are designing is in a community with a large Amish population. Can we count our (2) buggy parking spots as Low-Emitting vehicle parking?
VRV and ASHRAE 90.1-2007 and 189.1 Standards
NC-2009 EAc1:Optimize Energy Performanceposted by Sonia M. Miranda Palacios on
Hi all.
Maintaining just
CI-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elementsposted by Mike D on
Can we tabulate just one component e.g. finished ceiling - and not list all other components in the table?
LEED Interpretations
CI-2009 EAc4:Green Powerposted by Mike D on
Where can I find LEED Interpretation 1743?
Smoking zone area limit
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Omar Elrawy on
I have an office building of six floors, I need to know If there's a limitation to the percent of smoking zones, in other words, can I make two floors out of the six floors as smoking zones?
LEED After or Before?
NC-2009 EAp2:Minimum Energy Performanceposted by Robert Sutton on
Ok I am new to LEED but my architect is telling me that most of the LEED submission take place after the construction documents are done.