Steel

Schools-2009 MRc5:Regional Materials
posted by  Jose Martinez  on 

For steel products, would the extraction location be the mill where it is produced?

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Mar 22, 2013, 4:21 pm

Elevated Air Speed

CI-2009 IEQc7.1:Thermal Comfort—Design
posted by  Natalie Terrill  on 

Anybody else having a problem with elevated air speed (over 40 fpm)? I have a commerical office building with ceiling diffusers with 60 fpm and the credit has been audited for elevated air speed.

3
Mechanical Engineer
Integral Group
LEEDuser Expert
342 thumbs up
Fri Mar 22, 2013, 3:53 pm

USGBC Overhauls Demand Response Pilot - in Response to Critics

Pilot-Credits EApc8:Demand response
posted by  Tristan Roberts  on 

My colleague Nadav Malin has been investigating this credit and just wrote up the following about it, which he emailed to me:

16
Manager, LEED
USGBC
LEEDuser Premium Member
26 thumbs up
Fri Mar 22, 2013, 3:10 pm

WEp1- Kitchen Sink for Cafeteria

CI-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Sharon Chen  on 

I am working on a LEED CI project. It’s an office building with kitchen sinks in pantry areas throughout the building, which is available for all the occupants.

4
Fri Mar 22, 2013, 1:40 pm

Smoking areas

CS-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  charles bell  on 

We prohibit smoking in our office buildings, but have a central plaza which will provide designated smoking area. Question: does that designated smoking area need to be covered? Thanks!!

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Mar 22, 2013, 12:54 pm

One single treatment plant for two LEED projects

NC-2009 WEc2:Innovative Wastewater Technologies
posted by  Michael E. Edmonds-Bauer  on 

We have a project in which site two independent buildings will apply for LEED certification.

3
Fri Mar 22, 2013, 6:33 am

Weighted calculation - lower SRI value

CS-2009 SSc7.2:Heat Island Effect—Roof
posted by  LEED Pro Consultant  on 

Hello! We have a project in which the client will install a roofing material with an SRI value of 70 (low slope: requirement-78) for 100% of the roof area. Can this be compliant with this credit, u

3
Fri Mar 22, 2013, 4:43 am

Incorporating LEED interpretation to SSc5.1

CS-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Phil Meyer  on 

Hi all, I have a question regarding a recent LEED interpretation citing SSc5.1.

3
Fri Mar 22, 2013, 4:40 am

Shower/Changing Room not Required?

CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Marci Schreiber  on 

Our CS project has 66 FTEs. When I completed the SSc4.2 template on-line it automatically populated the "number of showers required" as "0". Can that be correct?

3
Fri Mar 22, 2013, 4:36 am

Alternative materials

CI-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Michael E. Edmonds-Bauer  on 

This might sound strange and totally out of the scope of LEED, but we wanted to check within LEED User since there are so many experts here. There is a project where the tenant has installed some

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Mar 22, 2013, 1:57 am