Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

To include rented vending machine?

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  Silvia Ruiz  on 

Hi, My client is thinking of renting a vending machine for his office pursuing LEED-CI certification.

4
Default Avatar
Civil Engineer & Sustainability Coordinator
Studio Domus
LEEDuser Basic Member
7 thumbs up
Fri Apr 26, 2013, 2:01 pm

Zone floor area for Prescriptive Method

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Sara Rosenthal  on 

How do I measure the zone floor area for the Prescriptive Method?

3
Fri Apr 26, 2013, 1:57 pm

Dial a Ride Shuttle

posted by  Eric Bosley  on 
10
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Thu Apr 25, 2013, 8:15 pm

GLP vs. Natural Gas

NC-2009 EAp2:Minimum Energy Performance
posted by  Marcio Alberto Casado Pereira  on 

Does LEED make a difference between GLP and Natural Gas? EAp2 template contemplates natural gas and electricity but we have showers that use GLP for domestic water heating.

3
Thu Apr 25, 2013, 5:41 pm

Energy Model Software

NC-2009 EAp2:Minimum Energy Performance
posted by  Pat Thomas  on 

I was just told by someone who 'used to work for USGBC' that use of eQuest requires prior approval, project by project ?? Does this make any sense to you ??

3
SUSTAINABILITY COORDINATOR
JALRW Eng. Group Inc.
LEEDuser Basic Member
24 thumbs up
Thu Apr 25, 2013, 2:57 pm

BLOW OUT FIXTURE

CS-2009 WEp1:Water Use Reduction
posted by  OSCAR DE LA RED  on 

Do I have to use the 3.5 gpf for baseline and installed blow out fixture if installed fixture is lower than 1.6 gpf.

2
Thu Apr 25, 2013, 7:57 am

Showering and Changing Facilities in Men´s Bathroom

CI-2009 SSc3.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Silvia Ruiz  on 

Hi, I am working on a small project that only requires one shower, but due to space constraints, the shower and changing room have been located inside the men's bathroom facilities.

4
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Thu Apr 25, 2013, 4:15 am

Title-24 and DES

General forums
posted by  Lauren Sparandara  on 

Hello, I have taken a look at Appendix B which includes Title-24 guidance within the District Thermal Energy LEED Guidance document.

8
Default Avatar
mechanical engineer
state of californiat
LEEDuser Basic Member
0 thumbs up
Thu Apr 25, 2013, 1:28 am

Tandem Spaces

CS-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Michael E. Edmonds-Bauer  on 

Our project, due to physical limitations of the site being this quite small, is providing mostly all of the spaces in tandem across 8 underground levels. According to calculations we need to provi

4
Wed Apr 24, 2013, 6:09 pm

International Project without Cut Sheets

NC-2009 MRc4:Recycled Content
posted by  Josh Sawyer  on 

We are working on an international project and the contractor is telling us that the standards in their country lack cut-sheets and MSDS sheets.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Apr 24, 2013, 5:01 pm