Forum quick links
To include rented vending machine?
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Silvia Ruiz on
Hi, My client is thinking of renting a vending machine for his office pursuing LEED-CI certification.
Zone floor area for Prescriptive Method
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Sara Rosenthal on
How do I measure the zone floor area for the Prescriptive Method?
GLP vs. Natural Gas
NC-2009 EAp2:Minimum Energy Performanceposted by Marcio Alberto Casado Pereira on
Does LEED make a difference between GLP and Natural Gas? EAp2 template contemplates natural gas and electricity but we have showers that use GLP for domestic water heating.
Energy Model Software
NC-2009 EAp2:Minimum Energy Performanceposted by Pat Thomas on
I was just told by someone who 'used to work for USGBC' that use of eQuest requires prior approval, project by project ?? Does this make any sense to you ??
BLOW OUT FIXTURE
CS-2009 WEp1:Water Use Reductionposted by OSCAR DE LA RED on
Do I have to use the 3.5 gpf for baseline and installed blow out fixture if installed fixture is lower than 1.6 gpf.
Showering and Changing Facilities in Men´s Bathroom
CI-2009 SSc3.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Silvia Ruiz on
Hi, I am working on a small project that only requires one shower, but due to space constraints, the shower and changing room have been located inside the men's bathroom facilities.
Title-24 and DES
posted by Lauren Sparandara on
Hello, I have taken a look at Appendix B which includes Title-24 guidance within the District Thermal Energy LEED Guidance document.
Tandem Spaces
CS-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Michael E. Edmonds-Bauer on
Our project, due to physical limitations of the site being this quite small, is providing mostly all of the spaces in tandem across 8 underground levels. According to calculations we need to provi
International Project without Cut Sheets
NC-2009 MRc4:Recycled Contentposted by Josh Sawyer on
We are working on an international project and the contractor is telling us that the standards in their country lack cut-sheets and MSDS sheets.