Topic | Recent |
---|---|
Length of construction projectGeneral forumsposted by Tristan Roberts on Jul 24, 2010, 11:03 am
Thomas, how long has construction been happening? There's no hard limit when it's "too late" to do an NC certification, but I've generally heard that when CDs are fairly complete or when... Last reply: Thomas Boyd, Jul 24, 2010, 11:51 am |
|
IEQ c5 requirement removedGeneral forumsposted by Allison Beer McKenzie on Jul 24, 2010, 9:03 am
It looks like the requirement for hazardous liquid waste containment for IEQc5: Indoor Chemical and Pollutant Source Control has been removed, which is probably for the better since the... |
|
Manufactured Offices?General forumsposted by Christopher Schaffner on Jul 24, 2010, 7:01 am
Not sure I follow your question? Are you talking about something like a construction trailer? The scope of 90.1 includes basically everything, except low-rise residential. So if you are trying to... Last reply: Jun Hashimoto, Jul 26, 2010, 4:45 am |
|
looking for this in LEED Reference GuidesGeneral forumsposted by Tristan Roberts on Jul 24, 2010, 12:16 am
Patrick, where are you seeing this? I'm looking at page 370 of the BD&C Reference Guide, and page 244 of the ID&C Reference Guide, and seeing them both reference ISO 14021. Both are LEED... |
|
Licensed Professional ExemptionsCS-2009 SSp1: Construction Activity Pollution Preventionposted by Heather Holdridge on Jul 23, 2010, 3:41 pmon the forum: The Licensed Professional Exemption is basically a streamlined documentation path that is available for certain credits, particularly design-oriented credits where a licensed professional... Last reply: Lisa Marshall, Jul 26, 2010, 12:30 pm |
|
E1 E0 woodCI-2009 IEQc4.4: Low-emitting materials - composite wood and agrifiber productsposted by Vivian Wan on Jul 23, 2010, 4:01 am
do you know whether E1 and E0... Last reply: Tristan Roberts, Jul 23, 2010, 11:00 am |
|
Value input for "Minimum required outside air flow,CFM"EBOM-2009 IEQp1: Minimum indoor air quality performanceposted by Yong Lee Low on Jul 23, 2010, 3:58 am
In this pre-requisite we are following 'Option A' and filling in details in the 2007UM_62MZ Calculator. Further,filling in the online template column 3 in Table 1.1 requires "Minimum... Last reply: Jenny Carney, Sep 28, 2010, 10:12 pm |
|
Irrigation systemNC-2009 WEc1: Water Efficient Landscapingposted by Fabio Frescia on Jul 22, 2010, 11:47 pm
Pls. can you advice to me about our specific case: Last reply: Gunnar Hubbard, Jul 27, 2010, 10:59 am |
|
base bldg equipment vs tenant equipmentEBOM-2009 EAc5: Enhanced Refrigerant Managementposted by Stephen Redding on Jul 22, 2010, 8:14 pm
EAc5 states that it is for 'base bldg' equipment and I have read their definition of base bldg as meaning permanently attached to the bldg, etc. Last reply: John Beeson, Sep 15, 2010, 9:25 am |
|
No smoking policy in urban area and the 25' rule.NC-2009 IEQp2: Environmental Tobacco Smoke (ETS) Controlposted by Paul Girello on Jul 22, 2010, 4:08 pm
We are certifying two buildings in Boston to be occupied by the State. The state has a No Smoking Policy on all properties. We know that we will have to determine how to convey this policy to the... Last reply: Keith Amann, Jul 26, 2010, 10:19 am |