Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Waste use for leveling

CS-2009 MRc2:Construction Waste Management
posted by  Michael E. Edmonds-Bauer  on 

If a project sent construction waste, meaning gypsum, concrete and masonry; to another construction site for leveling, is this considered a diversion from landfill? Thank you.

2
Default Avatar
LEEDuser Expert
472 thumbs up
Wed Jun 5, 2013, 6:16 pm

Exemplary Performance for Greenfields

NC-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Heather Holdridge  on 

I just wanted to confirm that greenfield sites are eligible for exemplary performance for this credit.

3
Sustainability Director
Lake|Flato Architects
LEEDuser Basic Member
78 thumbs up
Wed Jun 5, 2013, 5:53 pm

Cooling Tower Submetering

CI-2009 EAc3:Measurement and Verification
posted by  Saju Varghese  on 

Under the reference guide, it is requiring for process water to be submetered, which according to the glossary includes cooling tower water, boilers and chillers, but if the cooling tower is servin

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Jun 5, 2013, 5:34 pm

Accounting for Change Orders In Total Material Cost

CI-2009 MRc4:Recycled Content
posted by  Kevin Dunham  on 

Several of the MR credits (3.1, 3.2, 4, 5, 6, and 7) rely on a "Material and Resource Calculator" spreadsheet to determine whether certain thresholds have been met, and this spreadsheet in turn rel

3
Default Avatar
Architect
GSA
LEEDuser Basic Member
0 thumbs up
Wed Jun 5, 2013, 4:12 pm

Complex Occupancy

NC-2009 PIf3:Occupant and Usage Data
posted by  Zachary Mathern  on 

I have a police station project with a complex occupancy (multiple shifts, public meeting rooms, etc). I have the raw data (ie.

2
Default Avatar
Sustainability Architect
LEEDuser Basic Member
88 thumbs up
Wed Jun 5, 2013, 4:00 pm

Table Plf3-1 Space Usage Type

NC-2009 PIf3:Occupant and Usage Data
posted by  Catherine Blakemore  on 

One whole floor of my project is unconditioned mechanical space. Under what space usage type should it be logged?

2
Default Avatar
LEED Consultant
The Green Engineer
LEEDuser Basic Member
188 thumbs up
Wed Jun 5, 2013, 3:55 pm

Green cleaning innovation points

CI-2009 IDc1:Innovation in Design
posted by  Kim Sosalla-Bahr  on 

In looking to another LEED rating system for potential innovation points, you find several credits for green cleaning in the v2009 EB O+M rating system.

6
Director - Green Building Advisory
Colliers International Ltd.
LEEDuser Basic Member
201 thumbs up
Wed Jun 5, 2013, 2:48 pm
6
Wed Jun 5, 2013, 2:41 pm

Rideshare Program

CS-2009 SSc4.4:Alternative Transportation—Parking Capacity
posted by  Curt Pascoe  on 

I have a mixed-use building that is over 90% office, with only 4 residential units.

2
P.E., LEED AP BD+C
Ryan Companies US, Inc.
LEEDuser Basic Member
87 thumbs up
Wed Jun 5, 2013, 2:17 pm

LEED for HOMES or NC

LEED for Homes (LEED-H) Forum
posted by  Quentin Dantony  on 

Hello, I'm currently working in a french engineering office.

2
Wed Jun 5, 2013, 12:46 pm