Forum quick links
Non-US Green-E Available?
CS-2009 EAc6:Green Powerposted by Yoyo Shek on
Do anyone know if the Green-E supplier is limited in US?
LEED EB or NC?
posted by Elke Malleier on
We are building a considerable extension with new production lines to an existing manufacturing plant built in 1984, that has no LEED certification.
Definition of offices
CS-2009 IEQc8.2:Daylight and Views—Viewsposted by Ron Dean on
Hi, I want to know in the case that the building owner will rent all building offices, and design plans have a projected plant design free (without Closings) but the internal regulations of tenant
How are you interpreting this comment?
NC-2009 MRc5:Regional Materialsposted by Valerie Molinski on
Review comment that I have never received before states the following: "Several products include recycled content but are listed as being 100% regional.
NSF Applicability to Rainwater Reuse?
Pilot-Credits WEpc10:Sustainable wastewater managementposted by John Nichols on
We are confused on how to pursue this credit for buildings with rainwater reuse systems.
Contractor refusing to submit LEED documentation with submittals
posted by Elle Brown on
I have an issue that is on the cusp of turning into a nasty situation.
ASHRAE Mandatory provisions 10.4
NC-2009 EAp2:Minimum Energy Performanceposted by Elena Grau on
Hello, I’m currently working on a LEED NCv2009 project located in Spain. My question is about the compliance of the section 10.4.1 (Electric Motors) of ASHRAE 90.1-2007.
Hand hygiene sign locations
EBOM-2009 IEQp3:Green Cleaning Policyposted by Sara Fontaine on
We are working on a LEED for Schools project. Can anyone provide clarity on if the hand hygiene notices are only required at the staff/employee sinks to help achieve this credit?
LEED for homes certification in United Arab Emirates
posted by Mohd Imran Shaikh on
Hi There, We are currently looking to develop a very energy efficient villa in U.A.E. Does LEED for homes rating is available outside U.S as well?
Light Scheduling
NC-2009 EAp2:Minimum Energy Performanceposted by Jean Marais on
1) Assume the same scheduling is used in both design and baseline case, may I schedule lights to be off during occupied hours in a zone (both baseline and design models)? 2) Taking this a step furt