LEED boundary and materials scopeNC-2009 MRc4: Recycled Contentposted by Janika McFeely on Feb 8, 2011, 5:01 pm
A project we're working on is replacing some of the city sidewalk, which is outside our property line and LEED boundary. Should we include the concrete in our material calculations? Thanks,... Last reply: Janika McFeely, Feb 8, 2011, 7:42 pm |
|
WEp1- Substantial Completion DateEBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by susan eguia on Jan 27, 2011, 5:51 pm
As per WEp1 requirement, the water use baseline is set depending on the year of substantial completion of the building indoor plumbing system. What if the "date" is unknown, doesn't show in... Last reply: susan eguia, Feb 8, 2011, 7:23 pm |
|
just what I needed!General forumsposted by Crystal Brokaw on Feb 8, 2011, 3:10 pm
This addition was so timely for our project. We just switched from LEED-NC to LEED-CI, but USGBC has not officially swtiched us on LEEDOnline so we do not have access to the templates yet.... Last reply: Crystal Brokaw, Feb 8, 2011, 6:59 pm |
|
IEQ 8.1 Daylighting calculations for evening use spaces.NC-2009 IEQc8.1: Daylight and views - daylightposted by Eri Spaulding on Feb 1, 2011, 5:19 pm
Hello, Last reply: Jill Perry, PE, Feb 8, 2011, 5:33 pm |
|
Residential apartment in a dormatory buildingNC-2009 IEQc1: Outdoor Air Delivery Monitoringposted by David Rittlinger on Jan 24, 2011, 1:39 pm
Is there a requirement for an air flow monitoring station in a vertical air handler for a small resdiential apartment in a dormatory building? Typically these spaces only require around 100 cfm... Last reply: Vamshi Gooje, Feb 8, 2011, 5:09 pm |
|
Energy Star Space AllocationEBOM-2009 EAp2: Minimum Energy Efficiency Performanceposted by Ed Okon on Feb 3, 2011, 3:02 pm
Good Afternoon Last reply: Jenny Carney, Feb 8, 2011, 2:37 pm |
|
Multiple Drainage PatternsNC-2009 SSc6.1: Stormwater design - quantity controlposted by Joseph Blanco on Feb 7, 2011, 3:14 pm
Can you tell me how to calculate for multiple draingage sites, i have Three on this particular project. The TC is based on the length and travel and the slope towards the discharge point . Do i... Last reply: Gregory Hurst, Feb 8, 2011, 2:37 pm |
|
Equipment PurchasesEBOM-2009 IEQp3: Green Cleaning Policyposted by Curt Pascoe on Feb 8, 2011, 11:03 am
We are implementing a Green Cleaning Policy for an ID credit in NCv2009, which simply requires that you meet this prerequisite (not Credits 3.3 & 3.4). However, despite being NC, this... Last reply: Curt Pascoe, Feb 8, 2011, 2:08 pm |
|
Elevator cabsSchools-2009 IEQc4.6: Low-Emitting Materials—Ceiling and Wall Systemsposted by Linda Davisson on Feb 8, 2011, 12:10 pm
Often the finishes in an elevator cab are inert materials/non-emitting such as metal panels for walls and plastic unit lighting for ceilings. In the case of plastic laminate panels, the materials... Last reply: Josh Jacobs, Feb 8, 2011, 1:51 pm |
|
Indoor/Outdoor Carpeting in Large Open-Air Tropical LobbyEBOM-2009 IEQc3.5: Green cleaning - indoor chemical and pollutant source controlposted by Terry Gorski on Feb 4, 2011, 12:48 pm
For a building located in a tropical climate with an open- air lobby around the elevator banks, would indoor/outdoor carpeting completely under the cover of the building meet the requirements?... Last reply: Tristan Roberts, Feb 8, 2011, 12:13 pm |